Inspection |
Notes |
Performed By |
Date |
Passed: Engineering - Initial Driveway |
|
Mccormick, David |
3/24/2021 |
Passed: Building - Footer |
Verify Setbacks As Noted On Permit Also Install Ground Wire To Footer Steel Prior To Pour. |
Troy Crews |
3/30/2021 |
Passed: Engineering - Setbacks |
To Be Confirmed By Contractor
|
Troy Crews |
3/30/2021 |
Passed: Plumbing/Gas - 1st Underground Rough–In |
|
Anthony Aslan |
6/1/2021 |
Passed: Building - Slab |
|
Troy Crews |
6/7/2021 |
Passed: Building - Roof Decking |
|
Anthony Aslan |
1/27/2022 |
Failed: Building - Wall Sheathing |
Gables Missing Nails |
Anthony Aslan |
1/27/2022 |
Passed: Building - Wall Sheathing |
|
Troy Crews |
1/28/2022 |
Passed: Building - Framing |
Hold Down Garage Door Needs Nail, Windows Need Caulking And Screws And Tape |
Anthony Aslan |
2/4/2022 |
Passed: Plumbing/Gas - 2nd Rough-In |
Hose Bib By Garage Siding Guy Pushed In House |
Anthony Aslan |
3/25/2022 |
Passed: Mechanical - Rough In |
Exhaust Venting Missing On Bath Fans |
Anthony Aslan |
3/25/2022 |
Passed: Electrical - 2nd Rough-In |
Top Plate Notched More Than 50% Needs Cts 218 Strap |
Anthony Aslan |
3/25/2022 |
Passed: Engineering - Final Driveway |
|
Smith, Blake |
4/11/2022 |
Failed: Building - Insulation |
Ceiling Insulation Must Be R-30 Min., R-19 And Unmarked Stuffed Need Verification |
Anthony Aslan |
4/11/2022 |
Passed: Building - Insulation |
Corrections Made |
Anthony Aslan |
4/20/2022 |
Passed: Electrical - Permanent Power |
Need Septic Release |
Anthony Aslan |
12/13/2022 |
Release to power company |
|
Melissa Garber |
2/6/2023 |
Septic Release Inspection |
|
Health Dept |
2/6/2023 |
Failed: Building - Final |
Need Termite Final
master Bath Outlet Open Ground, Open Neutral, Not Gfci Outlet. |
Anthony Aslan |
6/20/2023 |
Passed: Building - Final |
Corrections And Documents Uploaded |
Anthony Aslan |
6/27/2023 |