Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit
Address 393 SE HOLLY TER
LAKE CITY, FL 32025
Parcel #: 08631-109
Acres: 4.82
Owner: Peter & Joann Lev
Subdivision: Creek Run Plantation
Zoning: A-3
Flood Zone: X
District: 4
Application #: 48590
Permit #: 000041516
Related Permit: Culvert: 000041515
Submitted:
Issued: Monday, March 15, 2021
Expires: Thursday, September 9, 2021
Completed: Thursday, September 9, 2021
Status: Completed
Septic Release? Yes
Notes:
ELEVATION CONFIRMATION LETTER REC'D @ 107.41'
Job Details
This is the construction of a Single Family Dwelling
Heated Area (Sqft) 1807
Total Area (Sqft) 2463
Stories 1
Building Height 20
Building Code Construction Type V
Building Code Element B
Building Code Occupancy Types Residential
Occupancy Use Title single family dwelling
Setbacks Front 30'
Setback Side 1 25'
Setback Side 2 25'
Setbacks Rear 25'
Septic# (00-0000) or (X00-000) 21-0129
Building Code Edition 2020 Florida Building Code 7th Edition and 2017 National Electrical Code
Elevation regulation Subdivision Plat
Finished floor requirement 102'
Requirement needed By Nailing Inspection
Document needed is a Surveyor letter giving the Finished Floor Elevation
Document receieved Yes
Fema map number 12023C0313D
In floodway N
Review Notes
3/1/2021 Point Review - Received-Hard Copy Application NEEDED: PRODUCT APPROVAL # FOR ROOFING MATERIAL LEV UPDATED LIABILITY
3/1/2021 Point Review - Reviewed NEEDED: PRODUCT APPROVAL # FOR ROOFING MATERIAL LEV UPDATED LIABILITY
3/2/2021 Zoning Review - Reviewed NEEDED: PRODUCT APPROVAL # FOR ROOFING MATERIAL LEV UPDATED LIABILITY
3/11/2021 Point Review - Reviewed NEEDED: LEV UPDATED LIABILITY
3/11/2021 Zoning Review - Reviewed NEEDED: LEV UPDATED LIABILITY
3/11/2021 Plan Review - Reviewed NEEDED: LEV UPDATED LIABILITY
3/11/2021 Final Review - Reviewed
3/15/2021 Permit Issued Permit #000041516 created and approved.
8/12/2021 Final Review - Payment Needed
Contractors
Name/ Business License Title Role
Joann T Lev
Exceptions Realty Llc
Liability Insurance Expired.
CRC1329719 Cert. Residential Contractor
Everton D Ruddock
D&s Lighting Inc
EC13003800 Electrical Contractor Subcontractor
Anthony R Franks
Franks & Lane Heating And Air Llc
CAC1818631 Cert. A/c Class “b” Subcontractor
Cody Barrs
Barrs Plumbing Inc
CFC1427145 Plumbing Contractor Subcontractor
Dana D Johnson
Mac Johnson Roofing, Inc.
CCC1325497 Cert Roofing Subcontractor
Inspections
Inspection Notes Performed By Date
Passed: Engineering - Initial Driveway Mccormick, David 3/15/2021
Passed: Electrical - Temporary Service Troy Crews 3/16/2021
Release to power company Troy Crews 3/16/2021
Passed: Building - Footer Anthony Aslan 3/26/2021
Passed: Engineering - Setbacks Anthony Aslan 3/26/2021
Passed: Plumbing/Gas - 1st Underground Rough–In Anthony Aslan 4/20/2021
Passed: Building - Slab Troy Crews 4/26/2021
Cancelled: Building - Footer Troy Crews 4/26/2021
Cancelled: Engineering - Setbacks Troy Crews 4/26/2021
Passed: Building - Masonry Wall Reinforcing Troy Crews 5/10/2021
Passed: Building - Roof Decking Troy Crews 5/20/2021
Passed: Electrical - 2nd Rough-In Anthony Aslan 6/11/2021
Passed: Mechanical - Rough In Fresh Air Missing Automatic Damper Anthony Aslan 6/11/2021
Passed: Plumbing/Gas - 2nd Rough-In Anthony Aslan 6/11/2021
Passed: Building - Framing Anthony Aslan 6/11/2021
Passed: Building - Insulation Anthony Aslan 6/16/2021
Passed: Engineering - Final Driveway Mccormick, David 8/2/2021
Passed: Electrical - Permanent Power Anthony Aslan 8/16/2021
Release to power company Anthony Aslan 8/16/2021
Passed: Building - Final Need Septic Release Anthony Aslan 9/3/2021
Release to power company Melissa Garber 9/9/2021
Certificate-Release Certificate Anthony Aslan 9/9/2021
Septic Release Inspection Health Dept 9/9/2021
Documents
File Name Date File Size
Termite Final Treatment 393 Se Holly Ter 2021-08-25 11.59.44.858.pdf 2023.12.24 1,016.06kB
Power Release-electrical-permanent Power 20210816.pdf 2023.12.24 39.04kB
Truss Engineering 20210526 120747.pdf 2023.12.24 16.84MB
Subcontractor Form 20210414 121247.pdf 2023.12.24 1.15MB
Application Information Page 20210414 120947.pdf 2023.12.24 365.62kB
Win_20210426_10_38_43_pro 2021-04-26 10.53.45.784.jpg 2023.12.24 110.57kB
Blower Door 2021-09-09 10.42.16.588.jpg 2023.12.24 171.79kB
Recorded Notice Of Commencement 20210414 121446.pdf 2023.12.24 361.57kB
911 Address Form 20210414 121246.pdf 2023.12.24 274.91kB
Plans 2021-03-26 12.22.08.786.pdf 2023.12.24 6.43MB
Certificate Of Occupancy 20210909.pdf 2023.12.24 62.21kB
Recorded Deed 20210414 121346.pdf 2023.12.24 505.09kB
Product Approval Code Specifications Form 20210303 142119.pdf 2023.12.24 117.17kB
Surveyor Letter Giving The Finished Floor Elevation 20210519 111546.pdf 2023.12.24 207.17kB
Owner And Contractor Signature Page 20210414 120946.pdf 2023.12.24 450.48kB
Residential Or Commercial Checklist 20210414 121445.pdf 2023.12.24 2.52MB
Manual J Forms 20210526 120646.pdf 2023.12.24 1.26MB
Product Approval Code Specifications Form 20210414 121745.pdf 2023.12.24 354.28kB
Lidar 48590 2021-03-02 11.22.16.517.pdf 2023.12.24 104.71kB
Energy Code Forms 20210414 124200.pdf 2023.12.24 1.54MB
Original Permit 20210315.pdf 2023.12.24 42.86kB
Power Release-electrical-temporary Service 20210316.pdf 2023.12.24 38.89kB
Site Plan 20210414 121046.pdf 2023.12.24 265.29kB
Septic Approval Paperwork 20210414 121347.pdf 2023.12.24 551.29kB
Power Release-release To Power Company 20210909.pdf 2023.12.24 39.04kB