Inspection |
Notes |
Performed By |
Date |
Passed: Engineering - Initial Driveway |
|
Mccormick, David |
3/15/2021 |
Passed: Building - Footer |
|
Anthony Aslan |
3/23/2021 |
Passed: Engineering - Setbacks |
|
Anthony Aslan |
3/23/2021 |
Passed: Electrical - Temporary Service |
Need Breaker Blank Offs In Sub Panel, Need Pictures When Installed |
Anthony Aslan |
3/23/2021 |
Passed: Plumbing/Gas - 1st Underground Rough–In |
120psi At Inspection |
Anthony Aslan |
4/7/2021 |
Electrical -Temporary Service |
|
Anthony Aslan |
4/15/2021 |
Passed: Electrical - Temporary Service |
Installed Breaker In Blank Process |
Anthony Aslan |
4/15/2021 |
Release to power company |
|
Anthony Aslan |
4/15/2021 |
Passed: Building - Slab |
|
Anthony Aslan |
4/15/2021 |
Passed: Building - Roof Decking |
|
Anthony Aslan |
6/17/2021 |
Passed: Building - Wall Sheathing |
|
Anthony Aslan |
6/21/2021 |
Failed: Electrical - 2nd Rough-In |
Missing Nail Guards, Anything Less Than 1.25" From Stud Face. |
Anthony Aslan |
7/19/2021 |
Failed: Mechanical - Rough In |
1) Dryer Box Can Not Oval Dryer Pipe, And Dryer Pipe Can Not Be Smashed To Fit Through Top Plate.
2) 2- Returns In Kitchen Are To Close To Stove, Need To Be More Than 11'ft Of Stove. |
Anthony Aslan |
7/19/2021 |
Passed: Mechanical - Rough In |
Corrections Made |
Anthony Aslan |
8/6/2021 |
Passed: Electrical - 2nd Rough-In |
Corrections Made |
Anthony Aslan |
8/6/2021 |
Passed: Plumbing/Gas - Tub Set/Shower Pan |
|
Anthony Aslan |
8/6/2021 |
Failed: Building - Strapping |
Missing Porch Post |
Anthony Aslan |
8/6/2021 |
Failed: Building - Framing |
Truss Packet Submittal Some Trusses Mismatching Packet |
Anthony Aslan |
8/6/2021 |
Passed: Plumbing/Gas - 2nd Rough-In |
|
Anthony Aslan |
8/6/2021 |
Passed: Building - Strapping |
Porch Post Installed |
Anthony Aslan |
8/10/2021 |
Failed: Building - Framing |
Truss Engineering Missing |
Anthony Aslan |
8/10/2021 |
Passed: Building - Framing |
Truss Engineering Corrections Made |
Anthony Aslan |
8/12/2021 |
Passed: Building - Insulation |
|
Anthony Aslan |
8/25/2021 |
Septic Release Inspection |
|
Health Dept |
10/6/2021 |
Passed: Electrical - Permanent Power |
Missing Some Outlet Covers Master Bath |
Anthony Aslan |
10/28/2021 |
Release to power company |
|
Anthony Aslan |
10/28/2021 |
Passed: Building - Final |
Need Driveway Final, Blower Door |
Anthony Aslan |
11/23/2021 |
Passed: Engineering - Final Driveway |
|
Smith, Blake |
12/9/2021 |
Certificate-Release Certificate |
|
Anthony Aslan |
12/15/2021 |