| Inspection |
Notes |
Performed By |
Date |
| Failed: Building - Footer |
No Compaction Test |
Anthony Aslan |
3/16/2021 |
| Passed: Engineering - Setbacks |
|
Anthony Aslan |
3/16/2021 |
| Passed: Building - Footer |
Rec'd Compaction Test |
Anthony Aslan |
3/18/2021 |
| Passed: Engineering - Setbacks |
|
Anthony Aslan |
3/18/2021 |
| Passed: Building - Vertical Cells/Columns |
|
Anthony Aslan |
4/5/2021 |
| Passed: Building - Roof Decking |
Southwest End Of Roof Needs Nails. |
Anthony Aslan |
5/19/2021 |
| Passed: Building - Framing |
Missing H2.5's |
Anthony Aslan |
5/19/2021 |
| Failed: Building - Wall Sheathing |
West Wall Checking |
Anthony Aslan |
5/19/2021 |
| Passed: Building - Ext Strapping/Wall Sheathing |
|
Anthony Aslan |
6/30/2021 |
| Passed: Building - Framing |
|
Anthony Aslan |
6/30/2021 |
| Passed: Building - Wall Sheathing |
|
Anthony Aslan |
6/30/2021 |
| Passed: Electrical - 2nd Rough-In |
|
Anthony Aslan |
6/30/2021 |
| Passed: Plumbing/Gas - 2nd Rough-In |
|
Anthony Aslan |
6/30/2021 |
| Passed: Building - Insulation |
|
Anthony Aslan |
7/22/2021 |
| Passed: Mechanical - Rough In |
Mini Split Line Set |
Anthony Aslan |
7/22/2021 |
| Septic Release Inspection |
|
Health Dept |
10/29/2021 |
| Failed: Building - Final |
Water Heater Needs Disconnect, Gfic On Column Is Tied Into Bath Gfic, A/c's Need Breaker Lock Outs Or Disconnects At Wall Mounts, And Control Wire For Units Needs To Be In Seal Tight. Need Blower Door Test. |
Anthony Aslan |
11/29/2021 |
| Rescheduled 12/3/2021:Building - Final |
|
Troy Crews |
12/3/2021 |
| Passed: Building - Final |
Corrections Made |
Anthony Aslan |
12/3/2021 |
| (Requested) Mobile Home-Mobile Home Set-Up Final |
|
|
|