Inspection |
Notes |
Performed By |
Date |
Passed: Plumbing/Gas - 1st Underground Rough–In |
|
Anthony Aslan |
3/24/2021 |
Passed: Building - Slab |
|
Anthony Aslan |
4/5/2021 |
Failed: Building - Ext Strapping/Wall Sheathing |
Red Marker Couple Places Nails Missing. Question On Lst30 For Gable Ends, Not Installed. |
Anthony Aslan |
4/26/2021 |
Passed: Building - Framing |
|
Anthony Aslan |
4/30/2021 |
Passed: Building - Ext Strapping/Wall Sheathing |
|
Anthony Aslan |
4/30/2021 |
Cancelled: Building - Slab |
|
Anthony Aslan |
5/7/2021 |
Passed: Electrical - 2nd Rough-In |
|
Anthony Aslan |
5/12/2021 |
Failed: Mechanical - Rough In |
Need Foam Gasket On All Supply And Return Boots |
Anthony Aslan |
5/12/2021 |
Passed: Plumbing/Gas - 2nd Rough-In |
|
Anthony Aslan |
5/12/2021 |
Failed: Building - Insulation |
Spots Missing Minor Insulation |
Anthony Aslan |
5/18/2021 |
Passed: Mechanical - Rough In |
Supply And Return Gaskets Installed. |
Anthony Aslan |
5/18/2021 |
Passed: Building - Insulation |
Exterior Doors Need To Be In Place Prior To Sheetrock Install |
Troy Crews |
5/20/2021 |
Passed: Engineering - Initial Driveway |
|
Mccormick, David |
9/7/2021 |
Passed: Engineering - Final Driveway |
|
Mccormick, David |
9/7/2021 |
Passed: Electrical - Permanent Power |
Need Septic Final |
Troy Crews |
9/10/2021 |
Release to power company |
|
Melissa Garber |
9/23/2021 |
Septic Release Inspection |
|
Health Dept |
9/23/2021 |
Passed: Building - Final |
Pending Back Porch Door |
Anthony Aslan |
10/26/2021 |
Certificate-Release Certificate |
Contractor Was Informed That If Blower Door Passed Back Porch Door Is Air Tight, Threshold Was Facing Inward. |
Anthony Aslan |
10/27/2021 |