Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

Roof Replacement or Repair Permit
Address 11427 SW TUSTENUGGEE AVE
FORT WHITE, FL 32038
Parcel #: 09624-002
Acres: 9.99
Owner: Kortessis Paul K & Sherry
Subdivision:
Zoning: A-3
Flood Zone: X
District: 4
Application #: 48605
Permit #: 000041481
Related Permit:
Submitted: Monday, March 8, 2021
Issued: Monday, March 8, 2021
Expires: Tuesday, September 7, 2021
Completed:
Status: Permit Issued
Septic Release? na
Notes:

Job Details
Type Roofing Job Re-Roof
Further Job Details (Explain if decking is being replaced and or Repairs are being done.) Remove shingles. Install metal purlins and metal roofing
Type of structure House
Commercial or Residential Commercial
Roof Area (for this job) Sq Ft 43
No. of Stories 1
Roof Pitch 3/12 and 6/12
Is the existing roof being removed? Yes
Type of New Roofing Product Metal
Florida Product Approval Number FL12725.3
Product Manufacturer Reeds Metal
Product Description 26 gage 3' wide panels
Building Code Edition 2020 Florida Building Code 7th Edition and 2017 National Electrical Code
Fema map number 12023C0485C
Review Notes
3/2/2021 Application pending.
3/8/2021 Final Review - Corrections Needed NEEDED: UPDATED PRODUCT APPROVAL #
3/8/2021 Final Review - Payment Needed
3/8/2021 Permit Issued Permit #000041481 created and approved.
Contractors
Name/ Business License Title Role
Jeffrey Bokor
Dwc Contracting Llc
CCC1329756 Roofing Contractor Contractor
Inspections
Inspection Notes Performed By Date
Passed: Re-Roof - In Progress Troy Crews 3/11/2021
Failed: Re-Roof - Final Screw Missing At Transition West Side Also Need To Confirm All Screws Match Possible Mixture Of Wood And Metal Screws Troy Crews 3/29/2021