Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit

Address 403 SW OAK WAY
LAKE CITY, FL 32025
Parcel #: 09116-124
Acres: 5.01
Owner: David And Martha Calverley
Subdivision: Hills At Rose Creek Phase 1
Zoning: PRRD
Flood Zone: X
District: 4
Application #: 48051
Permit #: 000041364
Related Permit: Culvert: 000041363
Submitted: Tuesday, December 29, 2020
Issued: Friday, February 19, 2021
Expires: Wednesday, December 1, 2021
Completed: Wednesday, December 1, 2021
Status: Completed
Septic Release? Yes
Notes:
WATER RUNOFF NATRUALLY FLOWS TO THIS LOT. EROSION CONTROL WILL BE NECESSARY, CONTRACTOR STATES SURVEYER WILL CONFIRM ALL SETBACKS INCLUDING WETLAND SETBACKS.
Job Details
Elevation regulation Minimum Requirement
Finished floor requirement One foot above the road
Fema map number 12023C0384D
In floodway N
This is the construction of a Single Family Dwelling
Setbacks Front 30
Setback Side 1 25
Setback Side 2 25
Setbacks Rear 25
Stories 2
Heated Area (Sqft) 2315
Total Area (Sqft) 4305
Building Height 22
Building Code Construction Type V
Building Code Element B
Building Code Occupancy Types Residential
Occupancy Use Title single family dwelling
Building Code Edition Florida Building Code 2017 6th Edition & 2014 National Electrical Code
Septic# (00-0000) or (X00-000) 21-0019
Review Notes
12/29/2020 Application pending.
12/30/2020 Point Review - Printed-Online Application
12/30/2020 Point Review - Reviewed
1/25/2021 Plan Review - Documents Required
2/3/2021 Zoning Review - Corrections Needed
2/16/2021 Plan Review - Documents Required
2/16/2021 Plan Review - Reviewed
2/19/2021 Zoning Review - Corrections Needed
2/19/2021 Zoning Review - Reviewed
2/19/2021 Final Review - Reviewed
2/19/2021 Final Review - Payment Needed
2/19/2021 Permit Issued
11/16/2021 Final Review - Payment Needed
Contractors
Name/ Business License Title Role
Isaiah Cully
Ic Construction Llc
CBC1259655 Building Contractor Contractor
Cody Barrs
Barrs Plumbing Inc
CFC1427145 Plumbing Contractor Subcontractor
Tyler M Turner
Tmt Roofing Llc
CCC1330410 Cert Roofing Subcontractor
Clinton G Wilson
Wilson Heat & Air Inc
CAC057886 Class B A/c Subcontractor
Everton D Ruddock
D&s Lighting Inc
EC13003800 Electrical Contractor Subcontractor
Inspections
Inspection Notes Performed By Date
Passed: Engineering - Initial Driveway Mccormick, David 2/22/2021
Passed: Engineering - Setbacks Need To Be Confirmed By Surveyor Troy Crews 4/6/2021
Passed: Building - Footer Footer Ok Need To Confirm Wetland Setback With Surveyor Prior To Pour Troy Crews 4/6/2021
Cancelled: Building - Framing Anthony Aslan 5/7/2021
Cancelled: Mechanical - Rough In Anthony Aslan 5/7/2021
Passed: Plumbing/Gas - 1st Underground Rough–In Troy Crews 5/18/2021
Passed: Electrical - Temporary Service Troy Crews 5/18/2021
Release to power company Troy Crews 5/18/2021
Passed: Building - Slab Troy Crews 5/21/2021
Passed: Building - Roof Decking Troy Crews 7/1/2021
Passed: Building - Wall Sheathing Porch Post Already Strapped Troy Crews 7/1/2021
Passed: Building - Framing Troy Crews 8/19/2021
Passed: Electrical - 2nd Rough-In Troy Crews 8/19/2021
Failed: Mechanical - Rough In Fireplace Duct Not Complete Troy Crews 8/19/2021
Passed: Plumbing/Gas - 2nd Rough-In Troy Crews 8/19/2021
Septic Release Inspection Health Dept 8/27/2021
Passed: Mechanical - Rough In Make Sure Straps Get Screwed Down On Fireplace Duct Troy Crews 8/27/2021
Passed: Building - Insulation Troy Crews 8/27/2021
Passed: Engineering - Final Driveway Jones, Richard 10/28/2021
Passed: Electrical - Permanent Power Troy Crews 11/16/2021
Release to power company Troy Crews 11/16/2021
Cancelled: Building - Final Troy Crews 11/23/2021
Passed: Building - Final Troy Crews 11/30/2021