Inspection |
Notes |
Performed By |
Date |
Passed: Electrical - Temporary Service |
|
Anthony Aslan |
2/25/2021 |
Release to power company |
|
Anthony Aslan |
2/25/2021 |
Release to power company |
|
Melissa Garber |
3/8/2021 |
Passed: Building - Footer |
|
Anthony Aslan |
3/12/2021 |
Passed: Engineering - Setbacks |
|
Anthony Aslan |
3/12/2021 |
Passed: Building - Masonry Wall Reinforcing |
|
Anthony Aslan |
3/30/2021 |
Passed: Plumbing/Gas - 1st Underground Rough–In |
60'psi At Inspection |
Anthony Aslan |
4/7/2021 |
Passed: Building - Slab |
Need Concrete Tickets Showing Fiber Mesh In Permit Box |
Anthony Aslan |
5/3/2021 |
Passed: Building - Roof Decking |
|
Anthony Aslan |
5/19/2021 |
Passed: Building - Wall Sheathing |
|
Anthony Aslan |
5/19/2021 |
Cancelled: Building - Roof Decking |
|
Anthony Aslan |
5/27/2021 |
Cancelled: Building - Wall Sheathing |
|
Anthony Aslan |
5/27/2021 |
Failed: Building - Framing |
Engineering Missing On T08 Truss, Also Dryer Box Can Not Oval Pipe And Laundry Wall Needs To Be Furred Out. |
Anthony Aslan |
6/3/2021 |
Failed: Building - Framing |
T08 Missing Engineering, There Are Two Truss |
Anthony Aslan |
6/11/2021 |
Passed: Building - Framing |
Added Engineering To T08 |
Anthony Aslan |
6/16/2021 |
Passed: Electrical - 2nd Rough-In |
|
Anthony Aslan |
6/30/2021 |
Passed: Mechanical - Rough In |
|
Anthony Aslan |
6/30/2021 |
Passed: Plumbing/Gas - 2nd Rough-In |
|
Anthony Aslan |
6/30/2021 |
Passed: Plumbing/Gas - Tub Set/Shower Pan |
|
Anthony Aslan |
6/30/2021 |
Passed: Plumbing/Gas - Tub Set/Shower Pan |
Master Tub |
Anthony Aslan |
7/12/2021 |
Passed: Building - Insulation |
Walls Only |
Anthony Aslan |
7/12/2021 |
Septic Release Inspection |
|
Health Dept |
8/19/2021 |
Cancelled: Electrical - 2nd Rough-In |
|
Anthony Aslan |
8/23/2021 |
Passed: Electrical - Permanent Power |
|
Anthony Aslan |
8/23/2021 |
Release to power company |
|
Anthony Aslan |
8/23/2021 |
Release to power company |
|
Melissa Garber |
8/27/2021 |
Passed: Building - Final |
|
Anthony Aslan |
11/8/2021 |