Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit

Address 417 NW HIGH POINT DR
LAKE CITY, FL 32055
Parcel #: 02202-130
Acres: 2.34
Owner: Montgomery Thomas G & Laura J Montgomery
Subdivision: High Pointe
Zoning: PRRD
Flood Zone: X
District: 3
Application #: 47384
Permit #: 000040746
Related Permit: Culvert: 000040745
Submitted: Monday, September 28, 2020
Issued: Thursday, April 1, 2021
Expires: Tuesday, August 31, 2021
Completed: Tuesday, August 31, 2021
Status: Completed
Septic Release? Yes
Notes:
PROPERTY HAS A NATURAL SIGNIFIGANT SLOPE FROM SIDE TO SIDE, IF CLEARING LOT - SILT FENCE REQUIRED TO PREVENT SOIL EROSION RUN-OFF ONTO OTHER PROPERTIES. AFTER PERMITTED A REVISED ENGINEER ELEVATION LETTER WAS SUBMITTED STATING THE MINIMUM FINISHED FLOOR ELEVATION OF 123.00' AND A SWALE CONSTRUCTED TO INTERCEPT RUN-FF AND DIRECT IT TO THE EAST AND WEST WOULD BE SUFFICIENT TO PROTECT THE STRUCTURE FROM A BASE FLOOD EVENT, SEE ATTACHED LETTER. BY NAILING A SURVEYORS ELEVATION CONFIRMATION LETTER IS REQUIRED AND BEFORE CO THE ENGINEER MUST SUBMIT AN APPROVAL LETTER FOR SWALE REQUIRMENTS. PERMIT WAS UPDATED.
Job Details
Elevation regulation Engineers Elevation Letter
Finished floor requirement 123.00' & SWALE ON NORTH SIDE OF STRUCTURE
Requirement needed By Nailing Inspection
Document needed is a Surveyor letter giving the Finished Floor Elevation
Document receieved Yes
Fema map number 12023C0280D
In floodway N
This is the construction of a Single Family Dwelling
Setbacks Front 30'
Setback Side 1 25'
Setback Side 2 25'
Setbacks Rear 25'
Stories 1
Heated Area (Sqft) 2386
Total Area (Sqft) 3661
Building Height 28
Building Code Construction Type V
Building Code Element B
Building Code Occupancy Types Residential
Occupancy Use Title single family
Building Code Edition Florida Building Code 2017 6th Edition & 2014 National Electrical Code
Septic# (00-0000) or (X00-000) 20-0813
Review Notes
9/28/2020 Application pending.
9/28/2020 Point Review - On Hold-Incomplete
10/2/2020 Plan Review - On Hold-Incomplete
10/5/2020 Zoning Review - Reviewed
10/13/2020 Plan Review - Documents Required
10/20/2020 Zoning Review - Reviewed
10/20/2020 Plan Review - Reviewed
10/20/2020 Final Review - Payment Needed
10/21/2020 Permit Issued Permit #000040746 created and approved.
12/28/2020 Permit reissued to reflect updated information.
4/1/2021 Permit reissued to reflect updated information.
Contractors
Name/ Business License Title Role
Isaiah Cully
Ic Construction Llc
CBC1259655 Building Contractor Contractor
Cody Barrs
Barrs Plumbing Inc
CFC1427145 Plumbing Contractor Subcontractor
Clinton G Wilson
Wilson Heat & Air Inc
CAC057886 Class B A/c Subcontractor
Everton D Ruddock
D&s Lighting Inc
EC13003800 Electrical Contractor Subcontractor
Tyler M Turner
Tmt Roofing Llc
CCC1330410 Cert Roofing Subcontractor
Inspections
Inspection Notes Performed By Date
Passed: Engineering - Initial Driveway Mccormick, David 10/21/2020
Passed: Building - Footer Matt Forsyth 12/22/2020
Passed: Engineering - Setbacks Matt Forsyth 12/22/2020
Passed: Electrical - Temporary Service Matt Forsyth 12/28/2020
Release to power company Matt Forsyth 12/28/2020
Passed: Plumbing/Gas - 1st Underground Rough–In Troy Crews 1/8/2021
Passed: Building - Slab Fibermesh Concrete Matt Forsyth 1/13/2021
Failed: Building - Framing Need 24 Inch Strapping On Post 2 Header Headers Inside Need To Be Nailed Top And Bottom 12 Inches On Center Matt Forsyth 5/7/2021
Failed: Electrical - 2nd Rough-In Need Larger Nail Plate Above Electrical Panel Matt Forsyth 5/7/2021
Passed: Mechanical - Rough In Matt Forsyth 5/7/2021
Failed: Plumbing/Gas - 2nd Rough-In No Pressure On Water System Matt Forsyth 5/7/2021
Passed: Electrical - 2nd Rough-In Matt Forsyth 5/10/2021
Passed: Building - Framing Matt Forsyth 5/17/2021
Passed: Building - Insulation Matt Forsyth 5/28/2021
Rescheduled 6/9/2021:Plumbing/Gas - 2nd Rough-In Matt Forsyth 6/8/2021
Passed: Plumbing/Gas - 2nd Rough-In Water Supply Under Pressure Matt Forsyth 6/9/2021
Passed: Electrical - Permanent Power Need Septic And Driveway Releases Matt Forsyth 8/12/2021
Passed: Engineering - Final Driveway Mccormick, David 8/13/2021
Release to power company Melissa Garber 8/17/2021
Septic Release Inspection Health Dept 8/17/2021
Passed: Building - Final Release Pending Pest Final And Follow Up Letter From Engineer On Swale. Troy Crews 8/30/2021
Certificate-Release Certificate Engineer Final Letter And Final Termite Cert Rec'd Troy Crews 8/31/2021
Documents