Permit Details

Permit Search

Permit

New Residential Construction

390 SW LENVIL LN
FORT WHITE, FL 32038

Permit #
000039580
Application #
44762
Status Completed
  1. Submitted Dec 3, 2021
  2. Issued Dec 3, 2021
  3. Expires Aug 23, 2023
  4. Completed Feb 24, 2023

Property

Parcel #
03667-012
Owner
Stephen Lambert
Acres
5.00
Subdivision
—
Zoning
A-3
Flood zone
X
District
2

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Minimum Requirement
Finished floor requirement
One foot above the road
Fema map number
12023C0390C
In floodway
N
This is the construction of a
Single Family Dwelling
Setbacks Front
30
Setback Side 1
25
Setback Side 2
25
Setbacks Rear
25
Stories
2
Heated Area (Sqft)
544
Total Area (Sqft)
544
Building Height
20
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
SINGLE FAMILY DWELLING
Building Code Edition
Florida Building Code 2017 6th Edition & 2014 National Electrical Code
Septic# (00-0000) or (X00-000)
20-0175

Status & Review History

  1. Point Review - Received
  2. Zoning Review - On Hold
  3. Zoning Review - Completed/Sent for Final Review
  4. Permit Issued
  5. Permit reissued to reflect updated information.

Contractors

This is an owner-builder project.

Inspections

  1. May 11, 2020

    Cancelled: Engineering - Setbacks

    Inspected by Melissa Garber

  2. May 11, 2020

    Cancelled: Building - Footer

    Inspected by Melissa Garber

  3. May 11, 2020

    Cancelled: Building - Footer

    Inspected by Melissa Garber

  4. May 11, 2020

    Cancelled: Engineering - Setbacks

    Inspected by Melissa Garber

  5. May 11, 2020

    Cancelled: Building - Footer

    Inspected by Melissa Garber

  6. May 11, 2020

    Cancelled: Engineering - Setbacks

    Inspected by Melissa Garber

  7. May 12, 2020

    Failed: Electrical - Temporary Service

    Need Gfci Protection On Outdoor Recptical

    Inspected by Matt Forsyth

  8. May 13, 2020

    Failed: Building - Footer

    Number 3 Bar In Footing Is Missing It's Called A Trans Verse Bar 48 Inches On Center. Dowel Bar In Footing At 48 Inches On Center Can Be Wet Set With Footing Pour

    Inspected by Matt Forsyth

  9. May 13, 2020

    Passed: Engineering - Setbacks

    Inspected by Matt Forsyth

  10. May 14, 2020

    Rescheduled 5/15/2020:Electrical - Temporary Service

    Inspected by Matt Forsyth

  11. May 15, 2020

    Passed: Electrical - Temporary Service

    Inspected by Matt Forsyth

  12. May 15, 2020

    Release to power company

    Inspected by Matt Forsyth

  13. May 15, 2020

    Passed: Building - Footer

    Inspected by Matt Forsyth

  14. May 15, 2020

    Passed: Engineering - Setbacks

    Inspected by Matt Forsyth

  15. Jun 24, 2020

    Failed: Plumbing/Gas - 1st Underground Rough–In

    Need Water Test On Sanitary Pipe

    Inspected by Matt Forsyth

  16. Jun 25, 2020

    Passed: Plumbing/Gas - 1st Underground Rough–In

    Inspected by Tommy Matthews

  17. Jul 1, 2020

    Rescheduled 7/2/2020:Building - Slab

    Rescheduled Per Contractor

    Inspected by Melissa Garber

  18. Jul 2, 2020

    Passed: Building - Slab

    Inspected by Tommy Matthews

  19. Oct 5, 2020

    Cancelled: Building - Framing

    Inspected by Melissa Garber

  20. Oct 5, 2020

    Cancelled: Building - Strapping

    Inspected by Melissa Garber

  21. Oct 8, 2020

    Passed: Building - Framing

    Inspected by Matt Forsyth

  22. Oct 8, 2020

    Failed: Building - Strapping

    Need Truss To Wall Strap

    Inspected by Matt Forsyth

  23. Oct 13, 2020

    Passed: Building - Framing

    Simpson 8"screw's

    Inspected by Matt Forsyth

  24. Oct 27, 2020

    Passed: Building - Wall Sheathing

    Inspected by Matt Forsyth

  25. Apr 14, 2021

    Passed: Electrical - 1st Underground Rough–In

    Conduit To House From Electric C.o. Pole

    Inspected by Troy Crews

  26. Aug 10, 2021

    Passed: Electrical - 2nd Rough-In

    Inspected by Matt Forsyth

  27. Aug 24, 2021

    Failed: Plumbing/Gas - 2nd Rough-In

    Nail Plates Needed When Vent Stack Or Water Supply Comes With In Inch And A Half Of Face Of Stud

    Inspected by Matt Forsyth

  28. Sep 10, 2021

    Septic Release Inspection

    Inspected by Health Dept

  29. Sep 23, 2021

    Passed: Building - Insulation

    Inspected by Matt Forsyth

  30. Sep 23, 2021

    Passed: Plumbing/Gas - 2nd Rough-In

    Inspected by Matt Forsyth

  31. Sep 23, 2021

    Failed: Electrical - Permanent Power

    Conduit Not Run For Service Entrance Conductors Also Need Driveway Release No Groundrod Installed

    Inspected by Matt Forsyth

  32. Oct 26, 2021

    Passed: Plumbing/Gas - Tub Set/Shower Pan

    Need Stairwell Built Before Next Inspection

    Inspected by Matt Forsyth

  33. Dec 21, 2021

    Passed: Building - Insulation

    Inspected by Matt Forsyth

  34. May 27, 2022

    Failed: Building - Final

    Blower Door Final Termite

    Inspected by Matt Forsyth

  35. May 27, 2022

    Cancelled: Electrical - Permanent Power

    Inspected by Matt Forsyth

  36. May 31, 2022

    Passed: Electrical - Permanent Power

    Inspected by Matt Forsyth

  37. May 31, 2022

    Release to power company

    Inspected by Matt Forsyth

  38. Nov 23, 2022

    Failed: Building - Final

    Need Kitchen Sink In Place, Landing At Doors 8.75 Inch Max Step Could Not Get In To Check Other Items.

    Inspected by Troy Crews

  39. Nov 23, 2022

    Passed: Engineering - Spot Check

    Gave Owner Parcel Checklist

    Inspected by Troy Crews

  40. Feb 24, 2023

    Passed: Building - Final

    Inspected by Matt Forsyth