Roof Replacement or Repair
Permit
| Application #: | 76395 |
| Permit #: |
000055707 |
| Related Permit: |
|
| Submitted: | Friday, May 15, 2026 |
| Issued: | Tuesday, May 19, 2026 |
| Expires: | Wednesday, June 3, 2026 |
| Completed: | Wednesday, June 3, 2026 |
| Status: |
Completed |
| Septic Release? |
N/A |
Job Details
| Finished floor requirement |
|
| Fema map number |
12023C0458C |
| Type Roofing Job |
Replacement - Tear off Existing and Replace |
| Type of structure |
House |
| Commercial or Residential |
Residential |
| No. of Stories |
1 |
| Roof Pitch |
4:12 or Greater |
| Is the existing roof being removed? |
Yes |
| Type of New Roofing Product |
Metal |
| Florida Product Approval Number |
FL46717.1 |
| Product Manufacturer |
Capital Metal Supply, Inc. |
| Product Description |
26 Ga. Steel (min) 1" Nailstrip Roof Panel, 16" Wide or 12" Wide, over 7/16" OSB Sheathing. |
| Building Code Edition |
2023 Florida Building Code 8th Edition and 2020 National Electrical Code |
| Sealed roof decking options: (Must select an option.) |
a minimum 4-inch wide strip of selfadhering polymer-modified bitumen complying with ASTM D1970 or a minimum 3 ¾ - inch wide strip of selfadhering flexible flashing tape complying with AAMA 711, applied over all joints in the roof decking. A felt underlayment complying with ASTM D226 Type II, ASTM D4869 Type Ill or IV, or ASTM D6757, or a synthetic underlayment meeting the performance requirements specified, is required to be applied over the strips/tape over the entire roof. |
| Ventilation: |
Ridge Vent |
| Flashing: |
Use Existing |
| Drip Edge: |
Replace All |
| Valley Treatment: |
New Metal |
| Any cable and/or race-way wiring located on or within the roof assembly? |
No |
Review Notes
| 5/15/2026 |
Application pending. |
| 5/15/2026 |
Application submitted by applicant. |
| 5/19/2026 |
Application Status Update Notification |
| 5/19/2026 |
Permit Issued |
Contractors
| Name / Business |
License |
Title |
Role |
Tyler M Turner Tmt Roofing Llc
|
CCC1330410 |
Cert Roofing |
Contractor |
Inspections
| Inspection |
Notes |
Performed By |
Date |
| Failed: Re-Roof - Roof Pictures Review |
Ridge Vent Picture Needed |
Matt Forsyth |
5/29/2026 |
| Passed: Re-Roof - In Progress |
|
Matt Forsyth |
5/29/2026 |
| Passed: Re-Roof - Roof Pictures Review |
|
Matt Forsyth |
6/1/2026 |
| Passed: Re-Roof - Roof Affidavit Review |
|
Matt Forsyth |
6/2/2026 |
| Passed: Re-Roof - Final |
|
Matt Forsyth |
6/3/2026 |