Permit Details

Permit Search

Permit

New Residential Construction

386 SW TIMBERLAND CT
LAKE CITY, FL 32024

Permit #
000043079
Application #
51980
Status Completed
  1. Submitted Oct 18, 2021
  2. Issued Nov 1, 2021
  3. Expires Oct 4, 2022
  4. Completed Apr 7, 2022

Property

Parcel #
02438-185
Owner
Cornerstone Developers Ii Llc
Acres
0.51
Subdivision
Emerald Cove Phase 2
Zoning
RSF-2
Flood zone
X
District
3

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Subdivision Plat
Finished floor requirement
104'
Requirement needed
By Nailing Inspection
Document needed is
a Surveyor letter giving the Finished Floor Elevation
Document receieved
Yes
Fema map number
12023C0290D
In floodway
N
This is the construction of a
Single Family Dwelling
Setbacks Front
25'
Setback Side 1
10'
Setback Side 2
10'
Setbacks Rear
15'
Stories
1
Heated Area (Sqft)
1710
Total Area (Sqft)
2641
Building Height
20
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
single family dwelling
Building Code Edition
2020 Florida Building Code 7th Edition and 2017 National Electrical Code
Septic# (00-0000) or (X00-000)
21-0822
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition)
a minimum 4-inch wide strip of selfadhering polymer-modified bitumen complying with ASTM D1970 or a minimum 3 ¾ - inch wide strip of selfadhering flexible flashing tape complying with AAMA 711, applied over all joints in the roof decking. A felt underlayment complying with ASTM D226 Type II, ASTM D4869 Type Ill or IV, or ASTM D6757, or a synthetic underlayment meeting the performance requirements specified, is required to be applied over the strips/tape over the entire roof.

Status & Review History

  1. Zoning Review - Reviewed
  2. Point Review - Received-Hard Copy Application
  3. Point Review - Reviewed
  4. Plan Review - Documents Required
  5. Plan Review - Documents Required
  6. Plan Review - Documents Required
  7. Plan Review - Plumbing Approved
  8. Plan Review - Mechanical Approved
  9. Plan Review - Electrical Approved
  10. Plan Review - Building Approved
  11. Plan Review - Reviewed
  12. Zoning Review - Reviewed
  13. Final Review - Documents Required
  14. Final Review - Payment Needed
  15. Permit Issued

Contractors

  • Jerry Castagna

    Castagna Construction Inc

    License
    CBC047842
    Title
    Building Contractor
    Role
    Contractor

    County License & State License & Liability Insurance & Workers Comp Expired.

  • Marcus Matthews

    Matthews Electric Llc

    License
    EC13005459
    Title
    Electrical Contractor
    Role
    Subcontractor
  • Derrick L Williams

    Dl Williams Heating & Cooling Llc

    License
    CAC1816913
    Title
    Class "b" A/c Contractor
    Role
    Subcontractor
  • Frank Soucinek

    Dependable Plumbing

    License
    CFC057747
    Title
    Plumbing Contractor
    Role
    Subcontractor

    County License & State License & Workers Comp & Employees Workers Comp Expired.

  • Darin L Summerlin

    Summerlin Roofing Inc

    License
    CCC1326192
    Title
    Roofing Contractor
    Role
    Subcontractor

Inspections

  1. Nov 2, 2021

    Passed: Plumbing/Gas - 1st Underground Rough–In

    Put Pressure Back On Water Lines Prior To Mono Slab Inspection

    Inspected by Troy Crews

  2. Nov 8, 2021

    Passed: Building - Slab

    House Only

    Inspected by Troy Crews

  3. Nov 15, 2021

    Passed: Building - Slab

    Recommend Expansion Material At Existing House Slab.

    Inspected by Troy Crews

  4. Nov 29, 2021

    Passed: Electrical - Temporary Service

    Inspected by Matt Forsyth

  5. Nov 29, 2021

    Release to power company

    Inspected by Matt Forsyth

  6. Jan 4, 2022

    Passed: Building - Roof Decking

    Inspected by Matt Forsyth

  7. Jan 4, 2022

    Passed: Building - Wall Sheathing

    Inspected by Matt Forsyth

  8. Jan 12, 2022

    Passed: Building - Ext Strapping/Wall Sheathing

    Inspected by Matt Forsyth

  9. Jan 12, 2022

    Passed: Building - Framing

    Inspected by Matt Forsyth

  10. Jan 12, 2022

    Passed: Building - Strapping

    Inspected by Matt Forsyth

  11. Jan 14, 2022

    Passed: Electrical - 2nd Rough-In

    Inspected by Matt Forsyth

  12. Jan 14, 2022

    Passed: Mechanical - Rough In

    Inspected by Matt Forsyth

  13. Jan 14, 2022

    Passed: Plumbing/Gas - 2nd Rough-In

    Inspected by Matt Forsyth

  14. Jan 14, 2022

    Passed: Plumbing/Gas - Tub Set/Shower Pan

    Tub Water Test Performed

    Inspected by Matt Forsyth

  15. Jan 19, 2022

    Passed: Building - Insulation

    All Foam Will Need Fresh Air With Damper On A.c.

    Inspected by Troy Crews

  16. Jan 19, 2022

    Passed: Building - Insulation

    Already Passed 1-19-22

    Inspected by Troy Crews

  17. Mar 14, 2022

    Passed: Electrical - Permanent Power

    Need Culvert Inspection And Final Septic

    Inspected by Troy Crews

  18. Mar 29, 2022

    Release to power company

    Inspected by Melissa Garber

  19. Mar 29, 2022

    Septic Release Inspection

    Inspected by Health Dept

  20. Apr 6, 2022

    Rescheduled 4/7/2022:Building - Final

    Inspected by Matt Forsyth

  21. Apr 7, 2022

    Passed: Building - Final

    Inspected by Matt Forsyth

Documents