Permit Details

Permit Search

Permit

Mobile Home

358 NW CRACKNEL WAY
LAKE CITY, FL 32055

Permit #
000041261
Application #
47793
Status Completed
  1. Submitted Nov 18, 2020
  2. Issued Feb 4, 2021
  3. Expires Nov 7, 2021
  4. Completed May 11, 2021

Property

Parcel #
01772-134
Owner
Schildknecht John & Pam
Acres
5.26
Subdivision
Suwannee Hills
Zoning
A-3
Flood zone
X
District
1

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Engineers Elevation Letter
Finished floor requirement
98.0 FEET AND 12 INCH ABOVE HIGHEST ADJACENT GRADE
Requirement needed
By Final Inspection
Document needed is
a Surveyor letter giving the Finished Floor Elevation
Document receieved
Yes
Fema map number
12023C0187D
In floodway
N
Mobile Home is a:
Double Wide
Year Built
2020
Width (Ft.In)
30
Length (Ft.In)
66
Driveway access to home:
Existing Drive
Installation Decal #
76323
Septic #
20-1021
Setbacks Front
30
Setback Side 1
25
Setbacks Rear
25
Dev Permit #
F023-
Setback Side 2
25
Are you applying for a 5 year temporary permit?
No
Serial #
DVAL12109231AB
Wind Zone?
2
Residential or Commercial Use?
Residential

Status & Review History

  1. Application pending.
  2. Point Review - Printed-Online Application
  3. Plan Review - Reviewed
  4. Zoning Review - Documents Required
  5. Zoning Review - Reviewed
  6. Final Review - Documents Required
  7. Final Review - Payment Needed
  8. Final Review - Payment Needed
  9. Permit Issued

Contractors

  • Roy M Harvey

    Mike Harvey Transport And Set Up

    License
    IH1122397-1
    Title
    Mh Installer (ih)
    Role
    Contractor

    County License & State License Expired.

  • Ronald Bonds Sr

    Style Crest Inc

    License
    CAC1817658
    Title
    Class "b" A/c Contractor
    Role
    Subcontractor

    County License & State License Expired.

  • Glenn Whittington

    Whittington Electric Inc

    License
    EC13002957
    Title
    Electrical Contractor
    Role
    Subcontractor

Inspections

  1. Feb 2, 2021

    Septic Release Inspection

    Inspected by Health Dept

  2. May 11, 2021

    Certificate-Release Certificate

    Inspected by Troy Crews

  3. May 11, 2021

    Passed: Mobile Home - Mobile Home Set-Up Final

    Inspected by Troy Crews

  4. May 11, 2021

    Release to power company

    Inspected by Troy Crews

  5. May 11, 2021

    Passed: Engineering - Setbacks

    Inspected by Troy Crews