Permit Details

Permit Search

Permit

Mobile Home

288 SW BIRLEY AVE
LAKE CITY, FL 32024

Permit #
000041080
Application #
47858
Status Completed
  1. Submitted Dec 9, 2020
  2. Issued Dec 30, 2020
  3. Expires Sep 18, 2021
  4. Completed Mar 22, 2021

Property

Parcel #
02428-003
Owner
Birley Landscape Services Llc - Carey Charles & Catherine
Acres
5.30
Subdivision
—
Zoning
RR
Flood zone
X
District
2

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Minimum Requirement
Finished floor requirement
One foot above the road
Fema map number
12023C0280D
In floodway
N
Mobile Home is a:
Double Wide
Year Built
2020
Width (Ft.In)
28
Length (Ft.In)
44
Driveway access to home:
Existing Drive
Installation Decal #
76577
Septic #
20-0918
Setbacks Front
25'
Setback Side 1
10'
Setbacks Rear
15'
Dev Permit #
F023-
Setback Side 2
10'
Are you applying for a 5 year temporary permit?
No
Serial #
fltwlct2838c7-3998ab
Wind Zone?
2
Residential or Commercial Use?
Residential

Status & Review History

  1. Application pending.
  2. Point Review - Printed-Online Application
  3. Point Review - On Hold-Incomplete
  4. Point Review - Reviewed
  5. Plan Review - Reviewed
  6. Zoning Review - Reviewed
  7. Permit Issued

Contractors

  • Ernest S Johnson

    Dependable Mobile Home Service

    License
    IH1025249
    Title
    Mh Installer (ih)
    Role
    Contractor

    County License & State License Expired.

  • Timothy D Shatto

    Shatto Heating & Air, Inc.

    License
    CAC057875
    Title
    A/c Class B
    Role
    Subcontractor

Inspections

  1. Mar 15, 2021

    Passed: Engineering - Setbacks

    Inspected by Matt Forsyth

  2. Mar 15, 2021

    Failed: Mobile Home - Mobile Home Set-Up Final

    Need Engineering Letter For House Not One Foot Above Road Ductwork 4"off Ground And Septic Release

    Inspected by Matt Forsyth

  3. Mar 16, 2021

    Septic Release Inspection

    Inspected by Health Dept

  4. Mar 22, 2021

    Passed: Mobile Home - Mobile Home Set-Up Final

    Inspected by Matt Forsyth

  5. Mar 22, 2021

    Release to power company

    Inspected by Matt Forsyth

  6. Mar 22, 2021

    Passed: Engineering - Setbacks

    Inspected by Matt Forsyth