Permit Details

Permit Search

Permit

New Residential Construction

107 SW ROUND HOUSE CT
FORT WHITE, FL 32038

Permit #
000041008
Application #
47718
Status Completed
  1. Submitted Oct 20, 2021
  2. Issued Jan 5, 2021
  3. Expires Apr 18, 2022
  4. Completed Oct 20, 2021

Property

Parcel #
04059-106
Owner
Chemerys Construction Llc
Acres
1.05
Subdivision
Fort White Station
Zoning
—
Flood zone
X
District
2

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Finished floor requirement
Fema map number
12023C0490C
This is the construction of a
Single Family Dwelling
Setbacks Front
25
Setback Side 1
15
Setback Side 2
10
Setbacks Rear
15
Stories
1
Heated Area (Sqft)
1440
Total Area (Sqft)
1960
Building Height
20
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
single family residence
Building Code Edition
Florida Building Code 2017 6th Edition & 2014 National Electrical Code
Septic# (00-0000) or (X00-000)
20-0881

Status & Review History

  1. Point Review - Received-Hard Copy Application
  2. Point Review - Reviewed
  3. Plan Review - Reviewed
  4. Final Review - Documents Required
  5. Final Review - Documents Required
  6. Plan Review - Reviewed
  7. Final Review - Documents Required
  8. Permit Issued
  9. Permit reissued to reflect updated information.

Contractors

  • Christopher Chemerys

    Chemerys Construction Llc

    License
    CRC1331778
    Title
    Cert. Residential
    Role
    Contractor

    County License & State License & Liability Insurance & Workers Comp Expired.

  • Marcus Matthews

    Matthews Electric Llc

    License
    EC13005459
    Title
    Electrical Contractor
    Role
    Subcontractor
  • Robert Ogles Ii

    Ogles Roofing & Construction Llc

    License
    CCC1328699
    Title
    Cert Roofing
    Role
    Subcontractor

    County License & State License Expired.

  • Robert M Bounds

    Bounds Heating & Air Inc

    License
    CAC057642
    Title
    Class A A/c
    Role
    Subcontractor
  • Cody Barrs

    Barrs Plumbing Inc

    License
    CFC1427145
    Title
    Plumbing Contractor
    Role
    Subcontractor

Inspections

  1. Jan 5, 2021

    Passed: Plumbing/Gas - 1st Underground Rough–In

    Inspected by Anthony Aslan

  2. Jan 27, 2021

    Passed: Building - Footer

    Inspected by Matt Forsyth

  3. Jan 27, 2021

    Passed: Engineering - Setbacks

    Inspected by Matt Forsyth

  4. Jan 28, 2021

    Passed: Building - Monolithic Slab

    Inspected by Matt Forsyth

  5. Jan 28, 2021

    Passed: Engineering - Setbacks

    Inspected by Matt Forsyth

  6. Mar 15, 2021

    Passed: Building - Roof Decking

    Inspected by Matt Forsyth

  7. Mar 15, 2021

    Passed: Building - Wall Sheathing

    Inspected by Matt Forsyth

  8. Mar 30, 2021

    Failed: Building - Framing

    1) 2"washers On Anchor Bolts Plans Spec 3"washers. 2) Missing Anchors On Bottom Plate At Splices Joints 3) Missing H2.5 On Front Gable Out Lookers, Also Missing On Hip Jacks In Back Room 4) Missing Truss Engineering.

    Inspected by Anthony Aslan

  9. Apr 6, 2021

    Failed: Building - Framing

    No Truss Engineering, No H2.5 On Front Gable.

    Inspected by Anthony Aslan

  10. Apr 6, 2021

    Passed: Electrical - 1st Underground Rough–In

    Need To Strap Up Hall Bath Exhaust Wiring..

    Inspected by Anthony Aslan

  11. Apr 6, 2021

    Passed: Plumbing/Gas - 2nd Rough-In

    Inspected by Anthony Aslan

  12. Apr 6, 2021

    Passed: Plumbing/Gas - Tub Set/Shower Pan

    Inspected by Anthony Aslan

  13. Apr 8, 2021

    Passed: Building - Framing

    Truss Engineering Installed

    Inspected by Anthony Aslan

  14. Apr 23, 2021

    Cancelled: Building - Fire Rated Wall

    Inspected by Anthony Aslan

  15. May 4, 2021

    Passed: Building - Insulation

    Inspected by Anthony Aslan

  16. May 4, 2021

    Failed: Mechanical - Rough In

    Outside, Fresh Air, Make Up Air, Can Not Be Direct Pull. Need Automatic Or Gravity Damper Installed.

    Inspected by Anthony Aslan

  17. May 6, 2021

    Passed: Mechanical - Rough In

    Inspected by Anthony Aslan

  18. Jun 2, 2021

    Septic Release Inspection

    Inspected by Health Dept

  19. Jun 25, 2021

    Passed: Electrical - Permanent Power

    Inspected by Anthony Aslan

  20. Jun 25, 2021

    Release to power company

    Inspected by Anthony Aslan

  21. Oct 20, 2021

    Passed: Building - Final

    Inspected by Anthony Aslan

Documents