Failed: Engineering - Zoning Final
Glazing On Front Facade Does Not Meet Minimal Standard Of 20% - As Approved Via The Site Plan. Glazing Must Be Installed As Per The Approved Architecture Plans And Approved By The Board Of Adjustment.
Inspected by Brandon Stubbs