389 NW QUINTEN STLAKE CITY, FL 32055
William P Byrne
Ajax Building Company Llc
County License & State License & Liability Insurance & Workers Comp Expired.
Erik W Worthmann
Comfort Temp Company/dba Ct Mechanical
County License & State License Expired.
Eric H Touchton
Touchton Plumbing Contractors Inc
Thomas Stalvey
Ace Electric Inc Of Valdosta Georgia
Ronald Benke
Cox Fire Protection Inc
Passed: Electrical - Temporary Service
Inspected by Troy Crews
Release to power company
Passed: Building - Footer
Partial Cell Foundations
Passed: Engineering - Setbacks
Passed: Plumbing/Gas - 1st Underground Rough–In
Waste Lines South Line Of Building
South End And ,southeast Cell Footers
Northwest Section
Passed: Electrical - 1st Underground Rough–In
3 Column Pads East Side One 12 Ft. Two 5 Ft.
5x52ft. Deep Columns West Side
Tie In Of 2 Main Sewer Lines With 2 Way Clean Out
14 Ft. Pads And One 3x3 Pad
Passed: Building - Monolithic Slab
Passed: Building - Slab
Electric Room
Passed: Building - Masonry Wall Reinforcing
Sw Corner North Of Electric Room
South Side Of Connecting Corridor And N.w. Corner
North Side Of Corridor And Various First Lift Block Cells
Cancelled: Building - Masonry Wall Reinforcing
Passed: Building - Framing
Anchor Bolts At Red Iron Beams.
Condenser Slabs South And North
Center Section Interior Walls First Lift And Partial Second Lift.
Top Out Electric Room Area And Partial Interior Hallways
Rescheduled 5/27/2021:Building - Masonry Wall Reinforcing
Rescheduled 5/27/2021:Building - Framing
Passed: Plumbing/Gas - 2nd Rough-In
Hot Water Lines Pressure 100p.s.i.
Passed: Building - Lintel/Tie Beam
Passed: Building - Fire Rated Wall
Passed: Building - Rated Assembly Fastening
Passed: Building - Ext Strapping/Wall Sheathing
South Side Corridor
Passed: Building - Wall Sheathing
Pictures Received
Cancelled: Mechanical - Rough In
Passed: Mechanical - Rough In
Pressure Test
Inspected by Anthony Aslan
Make Sure #4 Bars Are Changed Out To #5
# 4 Bar Each Cell
Also 2 Wings At Door Area
Failed: Mechanical - Pipe Pressure Test
Could Not Build Pressure, However Did Check Some Duct For Wrap
Failed: Mechanical - Performance Test and Balance
No Pressure
Passed: Plumbing/Gas - Water Pipe
Leak Test Smoke
Passed: Mechanical - Pipe Pressure Test
#5
Passed: Electrical - Permanent Power
Gas Test On Line
Passed: Electrical - Above Ceiling
East Duct
To Allow For Grid Ceiling Channel To Be Installed
Passed: Fire - Operational Test - Sprinkler/Standpipe
Pressure Test Of Overhead Sprinkler System. 4" Fdc Pipe Not Tested, Will Be Inspected/tested At A Later Date.
Inspected by Lance Hill
Passed: Building - Final
Release Of C.o. Pending F.d. And Smoke Test
Passed: Fire - Operational Test - Alarm System
Failed: Fire - Fire Final
Smoke Ejection System Not Operational Yet
Cancelled: Fire - Operational Test - Sprinkler/Standpipe
Completed 2/22/22
Cancelled: Fire - Operational Test - Alarm System
Cancelled: Fire - Fire Final
Rescheduled For A Later Date
Completed And Passed Pressure Test Of Standpipe 12/30/21
Failed: Building - Final
Control Dampers Not Operating
Passed: Certificate-Release Certificate
Passed: Fire - Fire Final