Permit Details

Permit Search

Permit

New Residential Construction

426 SW PINEHURST DR
LAKE CITY, FL 32024

Permit #
000040773
Application #
47388
Status Completed
  1. Submitted Sep 28, 2020
  2. Issued Dec 28, 2020
  3. Expires Oct 25, 2021
  4. Completed Apr 28, 2021

Property

Parcel #
03087-123
Owner
Brady Wilkinson & Ashley Beckman
Acres
0.73
Subdivision
Forest Country Sixth Addition
Zoning
RSF-2
Flood zone
X
District
3

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Engineers Elevation Letter
Finished floor requirement
99.67'
Requirement needed
By Nailing Inspection
Document needed is
a Surveyor letter giving the Finished Floor Elevation
Document receieved
Yes
Fema map number
12023C0289D
In floodway
N
This is the construction of a
Single Family Dwelling
Setbacks Front
25
Setback Side 1
10
Setback Side 2
10
Setbacks Rear
15
Stories
1
Heated Area (Sqft)
2140
Total Area (Sqft)
3146
Building Height
18
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
single family
Building Code Edition
Florida Building Code 2017 6th Edition & 2014 National Electrical Code
Septic# (00-0000) or (X00-000)
20-0830

Status & Review History

  1. Application pending.
  2. Point Review - Printed-Online Application
  3. Point Review - On Hold-Incomplete
  4. Point Review - Email Sent
  5. Point Review - Reviewed
  6. Plan Review - On Hold-Incomplete
  7. Zoning Review - Reviewed
  8. Plan Review - Documents Required
  9. Plan Review - Documents Required
  10. Plan Review - Documents Required
  11. Plan Review - Reviewed
  12. Zoning Review - Reviewed
  13. Final Review - Documents Required
  14. Final Review - Payment Needed
  15. Permit Issued
  16. Permit reissued to reflect updated information.
  17. Final Review - Payment Needed

Contractors

  • Isaiah Cully

    Ic Construction Llc

    License
    CBC1259655
    Title
    Building Contractor
    Role
    Contractor
  • Tyler M Turner

    Tmt Roofing Llc

    License
    CCC1330410
    Title
    Cert Roofing
    Role
    Subcontractor
  • Everton D Ruddock

    D&s Lighting Inc

    License
    EC13003800
    Title
    Electrical Contractor
    Role
    Subcontractor
  • Clinton G Wilson

    Wilson Heat & Air Inc

    License
    CAC057886
    Title
    Class B A/c
    Role
    Subcontractor
  • Cody Barrs

    Barrs Plumbing Inc

    License
    CFC1427145
    Title
    Plumbing Contractor
    Role
    Subcontractor

Inspections

  1. Nov 10, 2020

    Passed: Building - Footer

    Inspected by Matt Forsyth

  2. Nov 10, 2020

    Passed: Engineering - Setbacks

    Inspected by Matt Forsyth

  3. Nov 12, 2020

    Cancelled: Building - Footer

    Inspected by Matt Forsyth

  4. Dec 1, 2020

    Passed: Plumbing/Gas - 1st Underground Rough–In

    Inspected by Matt Forsyth

  5. Dec 4, 2020

    Passed: Building - Slab

    Need To Chair Up Front Perimeter #5 Bar Need Concrete Ticket Showing Fiber Mesh Used In Slab Left In Permit Box

    Inspected by Matt Forsyth

  6. Dec 29, 2020

    Passed: Electrical - Temporary Service

    Inspected by Matt Forsyth

  7. Dec 29, 2020

    Release to power company

    Inspected by Matt Forsyth

  8. Jan 21, 2021

    Release to power company

  9. Jan 21, 2021

    Passed: Building - Roof Decking

    Inspected by Matt Forsyth

  10. Jan 21, 2021

    Passed: Building - Wall Sheathing

    Inspected by Matt Forsyth

  11. Jan 27, 2021

    Failed: Building - Framing

    Missed Nailing On Some Headers And Porch Beams

    Inspected by Matt Forsyth

  12. Feb 5, 2021

    Failed: Building - Framing

    Check All Headers For Correct Nail Spacing Including Outside Of Porch Beams, Install Porch Post With Strapping,and Missing Heavy Girder Tie Downs At Garage

    Inspected by Troy Crews

  13. Feb 9, 2021

    Passed: Building - Framing

    Porch Strapping Will Be Installed After Rollock Masonry

    Inspected by Matt Forsyth

  14. Feb 18, 2021

    Passed: Building - Strapping

    Strapping Complete

    Inspected by Matt Forsyth

  15. Feb 19, 2021

    Passed: Electrical - 2nd Rough-In

    Inspected by Matt Forsyth

  16. Feb 19, 2021

    Passed: Mechanical - Rough In

    Inspected by Matt Forsyth

  17. Feb 19, 2021

    Passed: Plumbing/Gas - 2nd Rough-In

    Inspected by Matt Forsyth

  18. Mar 9, 2021

    Passed: Building - Insulation

    Inspected by Matt Forsyth

  19. Apr 8, 2021

    Passed: Electrical - Permanent Power

    Need Septic And Drive Releases-- Drive Rec'd-- Need Septic

    Inspected by Matt Forsyth

  20. Apr 14, 2021

    Septic Release Inspection

    Inspected by Health Dept

  21. Apr 15, 2021

    Release to power company

    Inspected by Melissa Garber

  22. Apr 28, 2021

    Passed: Building - Final

    Inspected by Matt Forsyth