Permit Details

Permit Search

Permit

New Residential Construction

417 NW HIGH POINT DR
LAKE CITY, FL 32055

Permit #
000040746
Application #
47384
Status Completed
  1. Submitted Sep 28, 2020
  2. Issued Apr 1, 2021
  3. Expires Feb 26, 2022
  4. Completed Aug 31, 2021

Property

Parcel #
02202-130
Owner
Montgomery Thomas G & Laura J Montgomery
Acres
2.34
Subdivision
High Pointe
Zoning
PRRD
Flood zone
X
District
3

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Engineers Elevation Letter
Finished floor requirement
123.00' & SWALE ON NORTH SIDE OF STRUCTURE
Requirement needed
By Nailing Inspection
Document needed is
a Surveyor letter giving the Finished Floor Elevation
Document receieved
Yes
Fema map number
12023C0280D
In floodway
N
This is the construction of a
Single Family Dwelling
Setbacks Front
30'
Setback Side 1
25'
Setback Side 2
25'
Setbacks Rear
25'
Stories
1
Heated Area (Sqft)
2386
Total Area (Sqft)
3661
Building Height
28
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
single family
Building Code Edition
Florida Building Code 2017 6th Edition & 2014 National Electrical Code
Septic# (00-0000) or (X00-000)
20-0813

Status & Review History

  1. Application pending.
  2. Point Review - On Hold-Incomplete
  3. Plan Review - On Hold-Incomplete
  4. Zoning Review - Reviewed
  5. Plan Review - Documents Required
  6. Zoning Review - Reviewed
  7. Plan Review - Reviewed
  8. Final Review - Payment Needed
  9. Permit Issued
  10. Permit reissued to reflect updated information.
  11. Permit reissued to reflect updated information.

Contractors

  • Isaiah Cully

    Ic Construction Llc

    License
    CBC1259655
    Title
    Building Contractor
    Role
    Contractor
  • Cody Barrs

    Barrs Plumbing Inc

    License
    CFC1427145
    Title
    Plumbing Contractor
    Role
    Subcontractor
  • Clinton G Wilson

    Wilson Heat & Air Inc

    License
    CAC057886
    Title
    Class B A/c
    Role
    Subcontractor
  • Everton D Ruddock

    D&s Lighting Inc

    License
    EC13003800
    Title
    Electrical Contractor
    Role
    Subcontractor
  • Tyler M Turner

    Tmt Roofing Llc

    License
    CCC1330410
    Title
    Cert Roofing
    Role
    Subcontractor

Inspections

  1. Dec 22, 2020

    Passed: Building - Footer

    Inspected by Matt Forsyth

  2. Dec 22, 2020

    Passed: Engineering - Setbacks

    Inspected by Matt Forsyth

  3. Dec 28, 2020

    Passed: Electrical - Temporary Service

    Inspected by Matt Forsyth

  4. Dec 28, 2020

    Release to power company

    Inspected by Matt Forsyth

  5. Jan 8, 2021

    Passed: Plumbing/Gas - 1st Underground Rough–In

    Inspected by Troy Crews

  6. Jan 13, 2021

    Passed: Building - Slab

    Fibermesh Concrete

    Inspected by Matt Forsyth

  7. May 7, 2021

    Failed: Building - Framing

    Need 24 Inch Strapping On Post 2 Header Headers Inside Need To Be Nailed Top And Bottom 12 Inches On Center

    Inspected by Matt Forsyth

  8. May 7, 2021

    Failed: Electrical - 2nd Rough-In

    Need Larger Nail Plate Above Electrical Panel

    Inspected by Matt Forsyth

  9. May 7, 2021

    Passed: Mechanical - Rough In

    Inspected by Matt Forsyth

  10. May 7, 2021

    Failed: Plumbing/Gas - 2nd Rough-In

    No Pressure On Water System

    Inspected by Matt Forsyth

  11. May 10, 2021

    Passed: Electrical - 2nd Rough-In

    Inspected by Matt Forsyth

  12. May 17, 2021

    Passed: Building - Framing

    Inspected by Matt Forsyth

  13. May 28, 2021

    Passed: Building - Insulation

    Inspected by Matt Forsyth

  14. Jun 8, 2021

    Rescheduled 6/9/2021:Plumbing/Gas - 2nd Rough-In

    Inspected by Matt Forsyth

  15. Jun 9, 2021

    Passed: Plumbing/Gas - 2nd Rough-In

    Water Supply Under Pressure

    Inspected by Matt Forsyth

  16. Aug 12, 2021

    Passed: Electrical - Permanent Power

    Need Septic And Driveway Releases

    Inspected by Matt Forsyth

  17. Aug 17, 2021

    Release to power company

    Inspected by Melissa Garber

  18. Aug 17, 2021

    Septic Release Inspection

    Inspected by Health Dept

  19. Aug 30, 2021

    Passed: Building - Final

    Release Pending Pest Final And Follow Up Letter From Engineer On Swale.

    Inspected by Troy Crews

  20. Aug 31, 2021

    Certificate-Release Certificate

    Engineer Final Letter And Final Termite Cert Rec'd

    Inspected by Troy Crews

Documents