Permit Details

Permit Search

Permit

New Residential Construction

234 NW TURKEY CREEK WAY
LAKE CITY, FL 32055

Permit #
000040719
Application #
47277
Status Completed
  1. Submitted Sep 15, 2020
  2. Issued Oct 15, 2020
  3. Expires Feb 15, 2022
  4. Completed Aug 19, 2021

Property

Parcel #
02279-124
Owner
386 Developement Llc
Acres
0.25
Subdivision
Turkey Creek Unit 1
Zoning
PRD
Flood zone
X
District
1

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Engineers Elevation Letter
Finished floor requirement
158.40'
Requirement needed
By Nailing Inspection
Document needed is
a Surveyor letter giving the Finished Floor Elevation
Document receieved
Yes
Fema map number
12023C0283D
In floodway
N
This is the construction of a
Single Family Dwelling
Setbacks Front
20'
Setback Side 1
10'
Setback Side 2
10'
Setbacks Rear
20'
Stories
1
Heated Area (Sqft)
1570
Total Area (Sqft)
2150
Building Height
19
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
single family
Building Code Edition
Florida Building Code 2017 6th Edition & 2014 National Electrical Code
Septic# (00-0000) or (X00-000)
20-0769

Status & Review History

  1. Application pending.
  2. Point Review - Printed-Online Application
  3. Point Review - Reviewed
  4. Point Review - Reviewed
  5. Zoning Review - Reviewed
  6. Plan Review - Reviewed
  7. Zoning Review - Reviewed
  8. Final Review - Documents Required
  9. Final Review - Payment Needed
  10. Final Review - Payment Needed
  11. Final Review - Payment Needed
  12. Permit Issued

Contractors

  • Kevin L Bedenbaugh Jr

    Plumb Level Construction Co Llc

    License
    CGC1516042
    Title
    General Contractor
    Role
    Contractor
  • Mark A Ganskop

    Express Plumbing Inc

    License
    CFC1428040
    Title
    Plumbing Contractor
    Role
    Subcontractor
  • Kevin L Bedenbaugh Jr

    Plumb Level Construction Co Llc

    License
    CCC1329482
    Title
    Roofing Contractor
    Role
    Subcontractor
  • Ryan Felknor

    Felknor Electric, Inc.

    License
    EC13003153
    Title
    Electrical Contractor
    Role
    Subcontractor
  • Timothy D Shatto

    Shatto Heating & Air, Inc.

    License
    CAC057875
    Title
    A/c Class B
    Role
    Subcontractor

Inspections

  1. Jan 7, 2021

    Passed: Building - Footer

    Inspected by Anthony Aslan

  2. Jan 7, 2021

    Passed: Engineering - Setbacks

    Need To Be Verified By Survey, Tight Lots.

    Inspected by Anthony Aslan

  3. Jan 22, 2021

    Passed: Plumbing/Gas - 1st Underground Rough–In

    Inspected by Anthony Aslan

  4. Feb 1, 2021

    Passed: Building - Slab

    Inspected by Anthony Aslan

  5. Feb 15, 2021

    Passed: Building - Roof Decking

    Inspected by Anthony Aslan

  6. Feb 15, 2021

    Passed: Building - Wall Sheathing

    Inspected by Anthony Aslan

  7. Feb 15, 2021

    Cancelled: Building - Ext Strapping/Wall Sheathing

    Inspected by Anthony Aslan

  8. Apr 15, 2021

    Failed: Building - Framing

    Garage End Wall Is Calling For Double Bottom Plate, Need Letter From Engineer For Single Bottom Plate.

    Inspected by Anthony Aslan

  9. Apr 15, 2021

    Passed: Building - Strapping

    Inspected by Anthony Aslan

  10. Apr 15, 2021

    Failed: Electrical - 2nd Rough-In

    Exhaust Fans Need To Be Wired Into Fan.

    Inspected by Anthony Aslan

  11. Apr 15, 2021

    Failed: Mechanical - Rough In

    Hall Exhaust Fan Venting Needs Strapping.

    Inspected by Anthony Aslan

  12. Apr 15, 2021

    Passed: Plumbing/Gas - 2nd Rough-In

    Inspected by Anthony Aslan

  13. Apr 21, 2021

    Passed: Mechanical - Rough In

    Inspected by Anthony Aslan

  14. Apr 21, 2021

    Passed: Electrical - 2nd Rough-In

    Inspected by Anthony Aslan

  15. Apr 21, 2021

    Passed: Building - Insulation

    Inspected by Anthony Aslan

  16. Apr 21, 2021

    Passed: Building - Framing

    Rec'd Letter

    Inspected by Anthony Aslan

  17. Jun 16, 2021

    Septic Release Inspection

    Inspected by Health Dept

  18. Jun 29, 2021

    Passed: Electrical - Permanent Power

    Need Culvert Release

    Inspected by Anthony Aslan

  19. Jul 12, 2021

    Release to power company

    Culvert Finaled 7.12.21

    Inspected by Anthony Aslan

  20. Aug 19, 2021

    Passed: Building - Final

    Inspected by Anthony Aslan

Documents