| Passed: Engineering - Setbacks |
|
Matt Forsyth |
10/8/2020 |
| Passed: Plumbing/Gas - 1st Underground Rough–In |
|
Matt Forsyth |
10/8/2020 |
| Passed: Building - Monolithic Slab |
|
Troy Crews |
10/13/2020 |
| Passed: Engineering - Setbacks |
|
Troy Crews |
10/13/2020 |
| Passed: Building - Roof Decking |
|
Matt Forsyth |
10/26/2020 |
| Passed: Building - Wall Sheathing |
|
Matt Forsyth |
10/26/2020 |
| Passed: Building - Framing |
|
Troy Crews |
11/16/2020 |
| Passed: Electrical - 2nd Rough-In |
|
Troy Crews |
12/17/2020 |
| Failed: Mechanical - Rough In |
Check Strapping Pinching Off Flex Duct Several Locations, Put Seals On Bottom Of Registers And Return Box For Drywall To Seal To, Check Dryer Flex Duct To Confirm Correct Thickness |
Troy Crews |
12/17/2020 |
| Passed: Plumbing/Gas - 2nd Rough-In |
|
Troy Crews |
12/17/2020 |
| Failed: Mechanical - Rough In |
Partially Corrected, Several Spots Strap Too Tight On Flex, Also Seal Bottom Of Return Box At Ceiling. Call Back In With Insulation Inspection. |
Troy Crews |
12/28/2020 |
| Failed: Building - Insulation |
Walls Not Done |
Troy Crews |
1/5/2021 |
| Passed: Mechanical - Rough In |
Items Corrected |
Troy Crews |
1/5/2021 |
| Passed: Building - Insulation |
|
Troy Crews |
1/7/2021 |
| Septic Release Inspection |
|
Health Dept |
3/11/2021 |
| Passed: Electrical - Permanent Power |
Fees Due For C.o. |
Troy Crews |
3/12/2021 |
| Release to power company |
|
Troy Crews |
3/12/2021 |
| Passed: Building - Final |
|
Troy Crews |
4/12/2021 |