Mobile Home
Permit
| Application #: | 46495 |
| Permit #: |
000040105 |
| Related Permit: |
|
| Submitted: | |
| Issued: | Tuesday, July 7, 2020 |
| Expires: | Friday, September 11, 2020 |
| Completed: | Friday, September 11, 2020 |
| Status: |
Completed |
| Septic Release? |
Yes |
Job Details
| Elevation regulation |
Minimum Requirement |
| Finished floor requirement |
One foot above the road |
| Fema map number |
12023C0467C |
| Mobile Home is a: |
Double Wide |
| Year Built |
2020 |
| Width (Ft.In) |
28 |
| Length (Ft.In) |
60 |
| Driveway access to home: |
Private Drive |
| Installation Decal # |
72050 |
| Septic # |
20-0519 |
| Setbacks Front |
30 |
| Setback Side 1 |
25 |
| Setbacks Rear |
25 |
| Dev Permit # |
F023- |
| Setback Side 2 |
25 |
| Are you applying for a 5 year temporary permit? |
No |
| Serial # |
LOHGA21935552AB |
| Wind Zone? |
2 |
| Residential or Commercial Use? |
Residential |
Review Notes
| 6/16/2020 |
Application pending. |
| 6/16/2020 |
Point Review - Printed-Online Application |
| 6/16/2020 |
Point Review - Reviewed |
| 6/18/2020 |
Zoning Review - Reviewed |
| 6/18/2020 |
Plan Review - Reviewed |
| 6/18/2020 |
Final Review - Documents Required |
| 6/30/2020 |
Final Review - Documents Required |
| 7/7/2020 |
Final Review - Payment Needed |
| 7/7/2020 |
Permit Issued |
Contractors
| Name / Business |
License |
Title |
Role |
Ronnie D Norris Norris Mobile Home Mover & Set Up
|
IH1025145 |
Mh Installer (ih) |
Contractor |
Glenn Whittington Whittington Electric Inc
|
EC13002957 |
Electrical Contractor |
Subcontractor |
Charles O Thomas Style Crest Inc
County License & State License Expired. |
CAC1817820 |
Cert. A/c Class “b” |
Subcontractor |
Inspections
| Inspection |
Notes |
Performed By |
Date |
| Septic Release Inspection |
|
Health Dept |
7/7/2020 |
| Passed: Mobile Home - In County Pre-Mobile Home before set-up |
|
Matt Forsyth |
8/25/2020 |
| Failed: Mobile Home - Mobile Home Set-Up Final |
Need Electrical Work Done.heat Source And Install Sticker |
Matt Forsyth |
8/27/2020 |
| Passed: Engineering - Setbacks |
|
Matt Forsyth |
8/27/2020 |
| Passed: Mobile Home - Mobile Home Set-Up Final |
|
Matt Forsyth |
9/11/2020 |
| Release to power company |
|
Matt Forsyth |
9/11/2020 |
| Passed: Engineering - Setbacks |
|
Matt Forsyth |
9/11/2020 |