Search pages and services on the county website.
Choose the colors you prefer.
Permit
139 SE RACHEL WAYLAKE CITY, FL 32025
Cody Barrs
Barrs Plumbing Inc
Roger D Whiddon
Whiddon Construction Co. Inc
Ryan C Beville
Rbi Electrical Contracting Llc
Stephen M Brisbois
Epic Ac Service
Robert S Stewart
Pfs Solutions Inc
County License & State License & Liability Insurance & Workers Comp & Employees Workers Comp Expired.
Passed: Electrical - Temporary Service
Inspected by Troy Crews
Release to power company
Failed: Building - Footer
Need To String Front Property Line To Confirm 25 Foot Set Back
Failed: Engineering - Setbacks
Need To Confirm 25 Foot Front Set Back
Left Front Corner Of House Less Than 24 Foot To Property Line
Passed: Building - Footer
Front Property Must Be Strung Again When Block Is Erected To Confirm Front Wall 25 Ft. From Front Property Line
Passed: Engineering - Setbacks
Must Be Confirmed Again With Stem Wall
Cancelled: Building - Footer
Passed: Plumbing/Gas - 1st Underground Rough–In
No String Across Front Property Line Needs To Be Confirmed By Builder Prior To Proceeding
Passed: Building - Slab
Passed: Building - Ext Strapping/Wall Sheathing
Cancelled: Building - Framing
Passed: Building - Roof Decking
Passed: Building - Framing
Passed: Electrical - 2nd Rough-In
Failed: Mechanical - Rough In
Not Complete Call Back In
Passed: Plumbing/Gas - 2nd Rough-In
Passed: Plumbing/Gas - Tub Set/Shower Pan
Oven Hood Duct Not In Place, Need Figures On Overall Length Of Dryer Vent 90 Degree Bends Etc., Will Need Proof Of Duct Seal At Plenum When Unit Is Set.
Passed: Mechanical - Rough In
Crimps On Oven Duct Turn Opposite Direction In Future, Air Handler Will Need Drain Pan When Installed
Passed: Building - Insulation
Failed: Electrical - Permanent Power
Need Lock On Panel If Garage Door Not Installed
Inspected by Matt Forsyth
Passed: Electrical - Permanent Power
Need Septic Release, Need Driveway Release
Inspected by Anthony Aslan
Failed: Building - Final
Need Septic Final, Driveway Final (rec'd), And Permanent Power On Building For Final C.o. Reminder Need Blower Door Test And Final Termite Also.
Need Septic Final For Release Of Power
Inspected by Melissa Garber
Septic Release Inspection
Inspected by Health Dept
Need Step At Garage Door, Need Blower Door Test, Final Termite Certificate, Light In Bathrooms blower Door Test Results Rec'd 6.25.21, Rec'd Termite Treatment 7.9.21
Steps Can Only Vary 3/8 Of Inch In Height
Passed: Building - Final
Step Within Tolerance