Permit Details

Permit Search

Permit

Mobile Home

317 NW PARK DR
LAKE CITY, FL 32055

Permit #
000039930
Application #
46024
Status Completed
  1. Submitted —
  2. Issued Jun 11, 2020
  3. Expires Jan 31, 2021
  4. Completed Aug 4, 2020

Property

Parcel #
02440-000
Owner
Mrvica David A & Barbara A
Acres
26.00
Subdivision
Twin Peaks Mh Park Llc
Zoning
RSF-2
Flood zone
X
District
3

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Minimum Requirement
Finished floor requirement
One foot above the road
Fema map number
12023C0280D
In floodway
N
Mobile Home is a:
Double Wide
Year Built
1988
Width (Ft.In)
28
Length (Ft.In)
40
Driveway access to home:
Existing Drive
Installation Decal #
65712
Septic #
20-0298
Are you applying for a 5 year temporary permit?
No
Serial #
338166C7135AB
Wind Zone?
2
Residential or Commercial Use?
Residential
Setbacks Front
25
Setback Side 1
10
Setbacks Rear
15
Dev Permit #
F023-
Setback Side 2
10

Status & Review History

  1. Application pending.
  2. Point Review - Received
  3. Plan Review - Completed/Sent for Zoning Review
  4. Zoning Review - Completed/Sent for Final Review
  5. Final Review - Completed/Sent for Final Review
  6. Final Review - On Hold-Incomplete
  7. Final Review - Payment Needed
  8. Permit Issued

Contractors

  • Brent M Strickland

    License
    IH1104218
    Title
    Mh Installer (ih)
    Role
    Contractor

Inspections

  1. Apr 24, 2020

    Septic Release Inspection

    Inspected by Health Dept

  2. Jun 11, 2020

    Passed: Mobile Home - In County Pre-Mobile Home before set-up

    Inspected by Troy Crews

  3. Jul 23, 2020

    Passed: Engineering - Setbacks

    Inspected by Tommy Matthews

  4. Jul 23, 2020

    Failed: Mobile Home - Mobile Home Set-Up Final

    Bond Wire Not Attached To One Side. Green Installation Decal Not Installed.

    Inspected by Tommy Matthews

  5. Aug 4, 2020

    Passed: Mobile Home - Mobile Home Set-Up Final

    Inspected by Troy Crews

  6. Aug 4, 2020

    Release to power company

    Inspected by Troy Crews

  7. Aug 4, 2020

    Passed: Engineering - Setbacks

    Inspected by Troy Crews