Permit Details

Permit Search

Permit

New Residential Construction

586 NW HIGH POINT DR
LAKE CITY, FL 32055

Permit #
000039757
Application #
44840
Status Completed
  1. Submitted —
  2. Issued May 11, 2020
  3. Expires May 9, 2021
  4. Completed Nov 10, 2020

Property

Parcel #
02202-110
Owner
Brown Road Builders Inc
Acres
3.71
Subdivision
High Pointe
Zoning
PRD
Flood zone
X AND A
District
3

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Minimum Requirement
Finished floor requirement
One foot above the road
Fema map number
12023C0280D
In floodway
N
This is the construction of a
Single Family Dwelling
Setbacks Front
30
Setback Side 1
25
Setback Side 2
25
Setbacks Rear
25
Stories
1
Heated Area (Sqft)
2110
Total Area (Sqft)
3022
Building Height
22
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
single family
Building Code Edition
Florida Building Code 2017 6th Edition & 2014 National Electrical Code
Septic# (00-0000) or (X00-000)
20-0247-n

Status & Review History

  1. Point Review - Received
  2. Permit Issued

Contractors

  • Isaiah Cully

    Ic Construction Llc

    License
    CBC1259655
    Title
    Building Contractor
    Role
    Contractor
  • Everton D Ruddock

    D&s Lighting Inc

    License
    EC13003800
    Title
    Electrical Contractor
    Role
    Subcontractor
  • Clinton G Wilson

    Wilson Heat & Air Inc

    License
    CAC057886
    Title
    Class B A/c
    Role
    Subcontractor
  • Cody Barrs

    Barrs Plumbing,inc.

    License
    CFC1427145
    Title
    Plumbing Contractor
    Role
    Subcontractor
  • Tyler M Turner

    Tmt Roofing Llc

    License
    CCC1330410
    Title
    Cert Roofing
    Role
    Subcontractor

Inspections

  1. May 14, 2020

    Passed: Building - Footer

    Inspected by Troy Crews

  2. May 14, 2020

    Passed: Engineering - Setbacks

    Inspected by Troy Crews

  3. May 28, 2020

    Passed: Electrical - 1st Underground Rough–In

    Inspected by Troy Crews

  4. May 28, 2020

    Passed: Plumbing/Gas - 1st Underground Rough–In

    Inspected by Troy Crews

  5. Jun 1, 2020

    Passed: Electrical - Temporary Service

    Inspected by Troy Crews

  6. Jun 1, 2020

    Release to power company

    Inspected by Troy Crews

  7. Jun 2, 2020

    Passed: Building - Slab

    Inspected by Troy Crews

  8. Jul 21, 2020

    Passed: Building - Ext Strapping/Wall Sheathing

    Wall Sheeting Only

    Inspected by Matt Forsyth

  9. Jul 21, 2020

    Passed: Building - Roof Decking

    Inspected by Matt Forsyth

  10. Jul 22, 2020

    Passed: Building - Strapping

    Inspected by Matt Forsyth

  11. Jul 29, 2020

    Failed: Building - Framing

    Check Back Over Truss Engineering, Need Repair For Truss Cut For Front Gable Window, Anchor Bolts Not Complete Including Plate Splices, Check Strapping On All Trusses Over 500 Pound Uplift, Garage Header Not Strapped And Tied At Bottom Per Plan, Girder Truss All Thread Not Installed.

    Inspected by Troy Crews

  12. Jul 31, 2020

    Passed: Electrical - Temporary Service

    Inspected by Matt Forsyth

  13. Jul 31, 2020

    Release to power company

    Inspected by Matt Forsyth

  14. Aug 12, 2020

    Failed: Building - Framing

    Check All Uplift Over 500 For More Clips, Gable Truss North End Needs Bracing, T-06 Truss Broken Need Repair Paperwork And Repair Done, Still Need Repairs For Trusses Cut For False Gable Windows. Do Not Insulate Needs Final Framing Inspection.

    Inspected by Troy Crews

  15. Aug 12, 2020

    Passed: Electrical - 2nd Rough-In

    Inspected by Troy Crews

  16. Aug 12, 2020

    Passed: Plumbing/Gas - 2nd Rough-In

    Inspected by Troy Crews

  17. Aug 12, 2020

    Failed: Mechanical - Rough In

    Oven Duct. Not Complete, Do Not Insulate House

    Inspected by Troy Crews

  18. Aug 28, 2020

    Passed: Mechanical - Rough In

    Inspected by Troy Crews

  19. Aug 28, 2020

    Failed: Building - Framing

    Same Framing Issues Remain

    Inspected by Troy Crews

  20. Sep 4, 2020

    Passed: Building - Framing

    Items Corrected

    Inspected by Troy Crews

  21. Sep 4, 2020

    Passed: Building - Insulation

    Inspected by Troy Crews

  22. Oct 14, 2020

    Septic Release Inspection

    Inspected by Health Dept

  23. Oct 29, 2020

    Rescheduled 10/30/2020:Electrical - Permanent Power

    Inspected by Troy Crews

  24. Oct 30, 2020

    Failed: Electrical - Permanent Power

    Meter Can Needs Temp Wires Removed From Main Lugs

    Inspected by Matt Forsyth

  25. Nov 2, 2020

    Passed: Electrical - Permanent Power

    Meter Can Adjusted

    Inspected by Matt Forsyth

  26. Nov 2, 2020

    Release to power company

    Inspected by Matt Forsyth

  27. Nov 9, 2020

    Failed: Building - Final

    Need Setback Letter Confirmation- Rec'd

    Inspected by Matt Forsyth

  28. Nov 10, 2020

    Passed: Building - Final

    Inspected by Matt Forsyth