Permit Details

Permit Search

Permit

New Residential Construction

567 NW HIGH POINTE DR
LAKE CITY, FL 32055

Permit #
000039133
Application #
44219
Status Completed
  1. Submitted —
  2. Issued Jan 10, 2020
  3. Expires Mar 28, 2021
  4. Completed Sep 29, 2020

Property

Parcel #
02202-113
Owner
Glen & Sabrina Colunga
Acres
1.12
Subdivision
High Pointe
Zoning
PRD
Flood zone
X
District
3

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Finished floor requirement
1' ABOVE ROAD
Fema map number
12023C0280D
In floodway
N
This is the construction of a
Single Family Dwelling
Setbacks Front
30
Setback Side 1
25
Setback Side 2
25
Setbacks Rear
25
Stories
1
Heated Area (Sqft)
2343
Total Area (Sqft)
4113
Building Height
20
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
single family
Building Code Edition
Florida Building Code 2017 6th Edition & 2014 National Electrical Code
Septic# (00-0000) or (X00-000)
19-0928

Status & Review History

  1. Zoning Review - Completed/Sent for Final Review
  2. Permit Issued

Contractors

  • Aaron Simque

    Aaron Simque Homes Inc

    License
    RR282811879
    Title
    Residential Contractor
    Role
    Contractor

    County License & State License & Liability Insurance & Workers Comp Expired.

  • Ryan C Beville

    Rbi Electrical Contracting Llc

    License
    EC13004236
    Title
    Electrical Contractor
    Role
    Subcontractor
  • Ralph W Laverdure

    Rwl Roofing,llc.

    License
    CCC1328590
    Title
    Roofing Contractor
    Role
    Subcontractor

    County License & State License & Liability Insurance & Workers Comp Expired.

  • Roger Whiddon

    Lake City Plumbing Inc

    License
    CFC1428686
    Title
    Cert Plumbing
    Role
    Subcontractor
  • Stephen M Brisbois

    Epic Ac Service

    License
    CAC1819412
    Title
    Cert. A/c Class “b”
    Role
    Subcontractor

Inspections

  1. Jan 13, 2020

    Failed: Building - Footer

    No Plans Or Permit On Site

    Inspected by Tommy Matthews

  2. Jan 13, 2020

    Failed: Engineering - Setbacks

    No Plans

    Inspected by Tommy Matthews

  3. Jan 14, 2020

    Passed: Building - Footer

    Inspected by Troy Crews

  4. Jan 14, 2020

    Passed: Engineering - Setbacks

    Inspected by Troy Crews

  5. Jan 21, 2020

    Passed: Plumbing/Gas - 1st Underground Rough–In

    Inspected by Troy Crews

  6. Jan 22, 2020

    Passed: Building - Slab

    Inspected by Troy Crews

  7. Feb 20, 2020

    Failed: Building - Roof Decking

    Not Ready.

    Inspected by Tommy Matthews

  8. Feb 20, 2020

    Failed: Building - Ext Strapping/Wall Sheathing

    Not Complete. Gables Not Ready. No Strapping Installed. Porch Columns Not Installed With Strapping. Make Sure Engineering Plans Are Available.

    Inspected by Tommy Matthews

  9. Apr 7, 2020

    Passed: Plumbing/Gas - 2nd Rough-In

    Inspected by Troy Crews

  10. Apr 7, 2020

    Failed: Mechanical - Rough In

    Not Complete

    Inspected by Troy Crews

  11. Apr 7, 2020

    Cancelled: Electrical - 1st Underground Rough–In

    Inspected by Troy Crews

  12. Apr 7, 2020

    Passed: Building - Wall Sheathing

    Inspected by Troy Crews

  13. Apr 7, 2020

    Failed: Building - Strapping

    Front Porch Post Not Strapped

    Inspected by Troy Crews

  14. Apr 7, 2020

    Failed: Building - Roof Decking

    Check Areas Above Bonus Room

    Inspected by Troy Crews

  15. Apr 7, 2020

    Cancelled: Building - Ext Strapping/Wall Sheathing

    Inspected by Troy Crews

  16. Apr 7, 2020

    Failed: Building - Framing

    Check Strapping On Double Girder Trusses

    Inspected by Troy Crews

  17. Apr 7, 2020

    Failed: Electrical - 2nd Rough-In

    Can Lights Disconnected In Master Bathroom And Open Wiring In Ceiling

    Inspected by Troy Crews

  18. Apr 13, 2020

    Passed: Building - Framing

    Inspected by Troy Crews

  19. Apr 13, 2020

    Cancelled: Building - Ext Strapping/Wall Sheathing

    Inspected by Troy Crews

  20. Apr 13, 2020

    Failed: Electrical - 2nd Rough-In

    Can Lights Still Disconnected In North East Bathroom

    Inspected by Troy Crews

  21. Apr 13, 2020

    Passed: Mechanical - Rough In

    Inspected by Troy Crews

  22. Apr 13, 2020

    Cancelled: Plumbing/Gas - 2nd Rough-In

    Inspected by Troy Crews

  23. Apr 13, 2020

    Passed: Building - Strapping

    Inspected by Troy Crews

  24. Apr 21, 2020

    Passed: Building - Insulation

    Inspected by Troy Crews

  25. Apr 27, 2020

    Passed: Electrical - 2nd Rough-In

    Inspected by Troy Crews

  26. Apr 28, 2020

    Failed: Building - Slab

    Prior To Approval, Need Structural Change Revision By Engineer. Need Porti Potti On Site. Need Correct Permit On Site. This Request Was Not The Correct Site Location. Termite Spray Not Approved. For Wrong Location.

    Inspected by Tommy Matthews

  27. Jul 30, 2020

    Failed: Electrical - Permanent Power

    No Conduit Out Of Meter Can, Need Garage Doors, Need Final Drive Approval And Septic Approval.

    Inspected by Troy Crews

  28. Aug 3, 2020

    Cancelled: Building - Slab

    Wrong Permit #

    Inspected by Troy Crews

  29. Aug 7, 2020

    Passed: Electrical - Permanent Power

    Electric Panel Lock Temporarily Also Need Final Driveway Release And Final Septic Release

    Inspected by Troy Crews

  30. Aug 10, 2020

    Septic Release Inspection

    Inspected by Health Dept

  31. Aug 13, 2020

    Release to power company

    Inspected by Melissa Garber

  32. Sep 25, 2020

    Failed: Building - Final

    Bad Receptacle In Garage And Waiting On Blower Door Test-rec'd

    Inspected by Matt Forsyth

  33. Sep 29, 2020

    Passed: Building - Final

    Waiver Permit 39134 Finaled 8/13/20-lh

    Inspected by Matt Forsyth