Failed: Building - Framing
Porch Posts Do Not Have Required Lsta24 Installed.
porch Ceiling Must Be Sheathed W/min 3/8” Osb.
2-2x4 Required Under D2gir Truss.
new Opening For Door Not Shown For Right Rear Bedroom. Must Have Engineer Account For This In Design. See S-3.
window Below Truss D7gir Requires 2 King Studs.
truss F3gir Requires 3-2x4 Centered Under Each End.
truss C1gir Needs 2-2x4 Centered Under Each End Of Truss.
anchor Bolts Required Within 6” Each Side Of Plate Joint.
truss C4, C5, C6, And C7 Missing Engineering Brace.
Inspected by Tommy Matthews