Status Completed
  1. Submitted Nov 14, 2018
  2. Issued May 7, 2020
  3. Expires Nov 4, 2020
  4. Completed May 8, 2020

Property

Parcel #
07570-014
Owner
James & Lora David
Acres
0.40
Subdivision
Suzanne
Zoning
RSF-2
Flood zone
X
District
4

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Finished floor requirement
Fema map number
12023C0311D
This is the construction of a
SFD, UTILITY
Setbacks Front
25.00
Setback Side 1
10.00
Setback Side 2
10.00
Setbacks Rear
15.00
Stories
1
Heated Area (Sqft)
1496.00
Total Area (Sqft)
2000.00
Building Code Edition
Florida Building Code 2017 6th Edition & 2014 National Electrical Code
Septic# (00-0000) or (X00-000)
18-0591

Status & Review History

  1. Permit Renewed

Contractors

  • Glenwood King

    License
    CBC059726
    Title
    —
    Role
    —

    County License & State License & Liability Insurance & Workers Comp & Employees Workers Comp Expired.

Inspections

  1. Nov 29, 2018

    Passed: Building - Footer

    Inspected by Tommy Matthews

  2. Nov 29, 2018

    Passed: Engineering - Setbacks

    Inspected by Tommy Matthews

  3. Jan 8, 2019

    Passed: Plumbing/Gas - Underground Rough-In

    Inspected by Tommy Matthews

  4. Jan 14, 2019

    Passed: Building - Slab

    Inspected by Tommy Matthews

  5. Jan 17, 2019

    Passed: Building - Slab

    Already Done On 1-14-19

    Inspected by Troy Crews

  6. Apr 16, 2019

    Passed: Building - Ext Strapping/Wall Sheathing

    Inspected by Tommy Matthews

  7. Apr 16, 2019

    Failed: Building - Roof Decking

    Remove And Renail Over Back Door And At Truss T04 Over Front Porch

    Inspected by Tommy Matthews

  8. Apr 16, 2019

    Failed: Building - Framing

    See Shearwall Detail Showing 2 King Studs At Each Opening Location.

    Inspected by Tommy Matthews

  9. May 7, 2019

    Passed: Building - Framing

    Items Corrected

    Inspected by Troy Crews

  10. May 7, 2019

    Passed: Electrical - Rough In

    Inspected by Troy Crews

  11. May 7, 2019

    Passed: Mechanical - Rough In

    Inspected by Troy Crews

  12. May 7, 2019

    Failed: Plumbing/Gas - Rough In

    Insulate Water Lines Near Soffit Areas Call Back In With Insulation Inspection

    Inspected by Troy Crews

  13. May 29, 2019

    Passed: Building - Insulation

    Inspected by Troy Crews

  14. May 29, 2019

    Passed: Plumbing/Gas - Rough In

    Pipes Are Insulated

    Inspected by Troy Crews

  15. Aug 14, 2019

    Failed: Building - Final

    Not Complete.to Many Issues To List.

    Inspected by Tommy Matthews

  16. Aug 14, 2019

    Passed: Electrical - Permanent Power

    Eh Rec'd, Need Driveway Final Rec'd

    Inspected by Tommy Matthews

  17. Aug 21, 2019

    Septic Release Inspection

    Inspected by Health Dept

  18. Aug 22, 2019

    Release to power company

    Inspected by Tm

  19. Dec 20, 2019

    Failed: Building - Final

    Seal Refrigerant Lines,blower Door Test, Final Termite Certificate.

    Inspected by Troy Crews

  20. Jan 23, 2020

    Failed: Building - Final

    Need Final Termite Cert-rec'd 1/29/20, Blower Door Test, Seal A.c. Chase Line By Outside Unit, All Rec'd

    Inspected by Troy Crews

  21. May 8, 2020

    Passed: Building - Final

    Inspected by Troy Crews