Failed: Engineering - Zoning Final
Site Work Is Not Complete. No Landscaping Has Been Placed. Landscaping Must Comply With The Approved Site Plan. Also, Erosion Into The Stormwater Management System Has Blocked Drains. Stormwater Management System And Drains Must Be Cleaned Out And Erosion Stabilization Must Be Utilized.
Inspected by Brandon Stubbs