Permit Details

Permit Search

Permit

New Commercial Construction

298 SW PROSPERITY PL
LAKE CITY, FL 32024

Permit #
000036348
Application #
36652
Status Completed
  1. Submitted Feb 21, 2018
  2. Issued Feb 21, 2018
  3. Expires Nov 20, 2019
  4. Completed Jun 6, 2019

Property

Parcel #
02432-141
Owner
Ohi Asset (fl) Lake City,llc
Acres
7.78
Subdivision
Cypress Lake Business Park
Zoning
CHI
Flood zone
X
District
3

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Finished floor requirement
Fema map number
12023C0290D
This is the construction of a:
NURSING HOME FACILITY
Driveway access to property:
Existing Drive
Is there a Fire Sprinkler System?
Yes
Setbacks Front
20.00
Setback Side 1
5
Setback Side 2
5
Setback Rear
15.00
Stories
1
Heated Area (Sqft)
83179.00
Total Area (Sqft)
88725.00
Building Code Construction Type
III
Building Code Element
A
Building Code Occupancy Types
Institutional
Occupancy Use Title
MIXED USE
Dev Permit #
F023-
Design Occupant Load
1530
Building Code Edition
Florida Building Code 2014 5th Edition & 2011 National Electrical Code
Septic# (00-0000) or (X00-000)
X-CITY

Status & Review History

No status updates yet.

Contractors

  • Carson Mccall

    License
    CGC1523777
    Title
    —
    Role
    —

    County License & State License Expired.

Inspections

  1. Feb 21, 2018

    Release to power company

    Inspected by Troy Crews

  2. Feb 22, 2018

    Passed: Electrical - Temporary Service

    Inspected by Troy Crews

  3. Mar 2, 2018

    Passed: Electrical - Underground Rough-In

    Main Conduits From Electric Room To Transformer

    Inspected by Troy Crews

  4. Mar 5, 2018

    Passed: Plumbing/Gas - Underground Rough-In

    Approved As Per Notes

    Inspected by Troy Crews

  5. Mar 5, 2018

    Passed: Plumbing/Gas - Sanitary

    Approved Per Notes

    Inspected by Troy Crews

  6. Mar 5, 2018

    Passed: Plumbing/Gas - Underground Rough-In

    Approved Per Notes

    Inspected by Troy Crews

  7. Mar 5, 2018

    Passed: Plumbing/Gas - Sanitary

    Approved Per Notes

    Inspected by Troy Crews

  8. Mar 5, 2018

    Passed: Plumbing/Gas - Rain Leader

    Approved Per Notes

    Inspected by Troy Crews

  9. Mar 7, 2018

    Passed: Building - Footer

    Approved As Requested

    Inspected by Troy Crews

  10. Mar 7, 2018

    Passed: Engineering - Setbacks

    Inspected by Troy Crews

  11. Mar 9, 2018

    Passed: Plumbing/Gas - Underground Rough-In

    Approved As Requested

    Inspected by Troy Crews

  12. Mar 9, 2018

    Passed: Plumbing/Gas - Sanitary

    Approved As Requested

    Inspected by Troy Crews

  13. Mar 9, 2018

    Passed: Plumbing/Gas - Rain Leader

    Approved As Requested

    Inspected by Troy Crews

  14. Mar 13, 2018

    Passed: Electrical - Underground Rough-In

    Approved As Requested

    Inspected by Troy Crews

  15. Mar 13, 2018

    Passed: Plumbing/Gas - Underground Rough-In

    Approved As Requested

    Inspected by Troy Crews

  16. Mar 13, 2018

    Passed: Plumbing/Gas - Rain Leader

    Approved As Requested

    Inspected by Troy Crews

  17. Mar 14, 2018

    Passed: Building - Footer

    Approved As Requested

    Inspected by Troy Crews

  18. Mar 14, 2018

    Passed: Engineering - Setbacks

    Inspected by Troy Crews

  19. Mar 14, 2018

    Passed: Plumbing/Gas - Underground Rough-In

    Approved As Requested

    Inspected by Troy Crews

  20. Mar 14, 2018

    Passed: Plumbing/Gas - Sanitary

    Approved As Requested

    Inspected by Troy Crews

  21. Mar 16, 2018

    Cancelled: Building - Slab

    Inspected by Troy Crews

  22. Mar 19, 2018

    Passed: Building - Masonry Wall Reinforcing

    Approved As Requested Sremwall

    Inspected by Troy Crews

  23. Mar 19, 2018

    Passed: Plumbing/Gas - Underground Rough-In

    Approved As Requested

    Inspected by Troy Crews

  24. Mar 19, 2018

    Passed: Plumbing/Gas - Sanitary

    Approved As Requested

    Inspected by Troy Crews

  25. Mar 21, 2018

    Passed: Building - Footer

    Approved As Requested

    Inspected by Troy Crews

  26. Mar 21, 2018

    Passed: Engineering - Setbacks

    Approved As Requested

    Inspected by Troy Crews

  27. Mar 22, 2018

    Passed: Building - Masonry Wall Reinforcing

    Approved As Requested

    Inspected by Troy Crews

  28. Mar 23, 2018

    Passed: Plumbing/Gas - Underground Rough-In

    Approved As Requested Waste Lines

    Inspected by Troy Crews

  29. Mar 23, 2018

    Passed: Plumbing/Gas - Sanitary

    Approved As Requested Waste Lines

    Inspected by Troy Crews

  30. Mar 26, 2018

    Passed: Plumbing/Gas - Underground Rough-In

    Approved As Requested

    Inspected by Troy Crews

  31. Mar 26, 2018

    Passed: Plumbing/Gas - Sanitary

    Approved As Requested

    Inspected by Troy Crews

  32. Mar 27, 2018

    Passed: Plumbing/Gas - Underground Rough-In

    Approved As Requested

    Inspected by Troy Crews

  33. Mar 27, 2018

    Passed: Plumbing/Gas - Sanitary

    Approved As Requested

    Inspected by Troy Crews

  34. Mar 28, 2018

    Passed: Electrical - Footer Steel & Grounding

    Approved As Requested

    Inspected by Troy Crews

  35. Mar 28, 2018

    Passed: Plumbing/Gas - Underground Rough-In

    Approved As Requested

    Inspected by Troy Crews

  36. Mar 28, 2018

    Passed: Plumbing/Gas - Sanitary

    Inspected by Troy Crews

  37. Mar 29, 2018

    Passed: Building - Footer

    Approved As Requested

    Inspected by Troy Crews

  38. Mar 29, 2018

    Passed: Engineering - Setbacks

    Inspected by Troy Crews

  39. Mar 29, 2018

    Passed: Building - Masonry Wall Reinforcing

    Approved As Requested

    Inspected by Troy Crews

  40. Mar 29, 2018

    Passed: Plumbing/Gas - Underground Rough-In

    Approved As Requested

    Inspected by Troy Crews

  41. Mar 29, 2018

    Passed: Plumbing/Gas - Sanitary

    Approved As Requested

    Inspected by Troy Crews

  42. Apr 2, 2018

    Rescheduled 4/3/2018:Building - Masonry Wall Reinforcing

    Inspected by Troy Crews

  43. Apr 2, 2018

    Rescheduled 4/3/2018:Plumbing/Gas - Rough In

    Inspected by Troy Crews

  44. Apr 2, 2018

    Rescheduled 4/4/2018:Plumbing/Gas - Sanitary

    Inspected by Troy Crews

  45. Apr 3, 2018

    Passed: Building - Masonry Wall Reinforcing

    Approved As Requested

    Inspected by Troy Crews

  46. Apr 3, 2018

    Passed: Plumbing/Gas - Rough In

    Approved As Requested

    Inspected by Troy Crews

  47. Apr 4, 2018

    Passed: Building - Slab

    Approved As Requested

    Inspected by Troy Crews

  48. Apr 5, 2018

    Cancelled: Plumbing/Gas - Underground Rough-In

    Inspected by Troy Crews

  49. Apr 5, 2018

    Cancelled: Plumbing/Gas - Sanitary

    Inspected by Troy Crews

  50. Apr 5, 2018

    Passed: Plumbing/Gas - Water Pipe

    Approved As Requested Domestic Water

    Inspected by Troy Crews

  51. Apr 5, 2018

    Passed: Plumbing/Gas - Underground Rough-In

    Approved As Requested

    Inspected by Troy Crews

  52. Apr 5, 2018

    Passed: Plumbing/Gas - Sanitary

    Approved As Requested

    Inspected by Troy Crews

  53. Apr 6, 2018

    Passed: Plumbing/Gas - Underground Rough-In

    Approved As Requested

    Inspected by Troy Crews

  54. Apr 6, 2018

    Passed: Plumbing/Gas - Sanitary

    Approved As Requested

    Inspected by Troy Crews

  55. Apr 9, 2018

    Passed: Building - Masonry Wall Reinforcing

    Approved As Requested

    Inspected by Troy Crews

  56. Apr 10, 2018

    Passed: Building - Masonry Wall Reinforcing

    Approved As Requested

    Inspected by Troy Crews

  57. Apr 10, 2018

    Passed: Plumbing/Gas - Underground Rough-In

    Approved As Requested

    Inspected by Troy Crews

  58. Apr 10, 2018

    Passed: Plumbing/Gas - Sanitary

    Approved As Requested

    Inspected by Troy Crews

  59. Apr 12, 2018

    Passed: Building - Slab

    Approved As Requested

    Inspected by Troy Crews

  60. Apr 12, 2018

    Passed: Plumbing/Gas - Underground Rough-In

    Approved As Requested

    Inspected by Troy Crews

  61. Apr 12, 2018

    Passed: Plumbing/Gas - Sanitary

    Approved As Requested

    Inspected by Troy Crews

  62. Apr 13, 2018

    Passed: Building - Masonry Wall Reinforcing

    Approved As Requested

    Inspected by Troy Crews

  63. Apr 13, 2018

    Passed: Plumbing/Gas - Underground Rough-In

    Approved As Requested

    Inspected by Troy Crews

  64. Apr 13, 2018

    Passed: Plumbing/Gas - Sanitary

    Approved As Requested

    Inspected by Troy Crews

  65. Apr 17, 2018

    Passed: Building - Masonry Wall Reinforcing

    Approved As Requested

    Inspected by Troy Crews

  66. Apr 17, 2018

    Passed: Plumbing/Gas - Underground Rough-In

    Approved As Requested

    Inspected by Troy Crews

  67. Apr 17, 2018

    Passed: Plumbing/Gas - Sanitary

    Approved As Requested

    Inspected by Troy Crews

  68. Apr 18, 2018

    Passed: Building - Slab

    Approved As Requested

    Inspected by Troy Crews

  69. Apr 19, 2018

    Passed: Plumbing/Gas - Underground Rough-In

    Approved As Requested

    Inspected by Troy Crews

  70. Apr 19, 2018

    Passed: Plumbing/Gas - Sanitary

    Approved As Requested

    Inspected by Troy Crews

  71. Apr 20, 2018

    Passed: Plumbing/Gas - Underground Rough-In

    Approved As Requested

    Inspected by Troy Crews

  72. Apr 24, 2018

    Passed: Building - Masonry Wall Reinforcing

    Approved As Requested

    Inspected by Troy Crews

  73. Apr 25, 2018

    Passed: Building - Slab

    Approved As Requested

    Inspected by Troy Crews

  74. Apr 26, 2018

    Passed: Building - Lintel/Tie Beam

    Approved As Requested

    Inspected by Troy Crews

  75. May 4, 2018

    Passed: Building - Masonry Wall Reinforcing

    Approved As Requested

    Inspected by Troy Crews

  76. May 8, 2018

    Passed: Building - Slab

    Approved As Requested

    Inspected by Troy Crews

  77. May 9, 2018

    Passed: Building - Roof Decking

    Approved As Requested

    Inspected by Troy Crews

  78. May 10, 2018

    Passed: Building - Slab

    Approved As Requested

    Inspected by Troy Crews

  79. May 11, 2018

    Passed: Building - Lintel/Tie Beam

    Approved As Requested

    Inspected by Troy Crews

  80. May 11, 2018

    Passed: Building - Masonry Wall Reinforcing

    Approved As Requested

    Inspected by Troy Crews

  81. May 14, 2018

    Passed: Building - Roof Decking

    Approved As Requested

    Inspected by Troy Crews

  82. May 23, 2018

    Passed: Building - Slab

    Approved As Requested

    Inspected by Troy Crews

  83. May 23, 2018

    Passed: Building - Roof Decking

    Approved Zone 5

    Inspected by Troy Crews

  84. May 29, 2018

    Passed: Building - Masonry Wall Reinforcing

    Approved As Requested

    Inspected by Troy Crews

  85. Jun 1, 2018

    Passed: Building - Vertical Cells/Columns

    Approved As Requested

    Inspected by Troy Crews

  86. Jun 1, 2018

    Passed: Building - Framing

    Approved As Requested

    Inspected by Troy Crews

  87. Jun 1, 2018

    Passed: Building - Vertical Cells/Columns

    Inspected by Troy Crews

  88. Jun 1, 2018

    Passed: Fire - Underground Main - Visual

    Inspected by Josh Wehinger

  89. Jun 8, 2018

    Passed: Building - Masonry Wall Reinforcing

    Approved As Requested

    Inspected by Troy Crews

  90. Jun 8, 2018

    Passed: Building - Roof Decking

    Approved As Requested

    Inspected by Troy Crews

  91. Jun 11, 2018

    Passed: Building - Lintel/Tie Beam

    Approved As Requested

    Inspected by Troy Crews

  92. Jun 13, 2018

    Passed: Building - Framing

    Approved As Requested

    Inspected by Troy Crews

  93. Jun 15, 2018

    Passed: Building - Vertical Cells/Columns

    Approved As Requested

    Inspected by Troy Crews

  94. Jun 15, 2018

    Passed: Building - Masonry Wall Reinforcing

    Approved As Requested

    Inspected by Troy Crews

  95. Jun 21, 2018

    Passed: Plumbing/Gas - Interceptor

    Back To Back Grease Tanks Approved As Requested

    Inspected by Troy Crews

  96. Jun 21, 2018

    Passed: Building - Vertical Cells/Columns

    Approved As Requested

    Inspected by Troy Crews

  97. Jun 21, 2018

    Passed: Building - Lintel/Tie Beam

    Approved As Requested

    Inspected by Troy Crews

  98. Jun 21, 2018

    Passed: Building - Masonry Wall Reinforcing

    Approved As Requested

    Inspected by Troy Crews

  99. Jun 28, 2018

    Passed: Building - Rated Assembly Fastening

    Hallway And Partial Bathrooms Zone 1 And Partial Hallway Zone 2

    Inspected by Troy Crews

  100. Jul 10, 2018

    Passed: Building - Roof Decking

    Approved As Requested

    Inspected by Troy Crews

  101. Jul 11, 2018

    Passed: Building - Framing

    Approved As Requested

    Inspected by Troy Crews

  102. Jul 12, 2018

    Passed: Plumbing/Gas - Rain Leader

    Approved As Requested

    Inspected by Troy Crews

  103. Jul 12, 2018

    Passed: Building - Framing

    Approved As Requested

    Inspected by Troy Crews

  104. Jul 17, 2018

    Passed: Building - Lintel/Tie Beam

    Approved As Requested

    Inspected by Troy Crews

  105. Jul 17, 2018

    Passed: Building - Masonry Wall Reinforcing

    Approved As Requested

    Inspected by Troy Crews

  106. Aug 3, 2018

    Rescheduled 8/6/2018:Plumbing/Gas - Water Pipe

    Inspected by Troy Crews

  107. Aug 6, 2018

    Passed: Plumbing/Gas - Water Pipe

    Approved As Requested 100 Psi

    Inspected by Troy Crews

  108. Aug 13, 2018

    Passed: Fire - Operational Test - Chemical/Gaseous Agent

    Inspected by Josh Wehinger

  109. Aug 15, 2018

    Passed: Electrical - Above Ceiling

    Rough In Tower Area Approved As Requested

    Inspected by Troy Crews

  110. Aug 15, 2018

    Passed: Mechanical - Above Ceiling

    Rough In Tower Area Approved As Requested

    Inspected by Troy Crews

  111. Aug 23, 2018

    Passed: Building - Insulation

    Approved As Requested Tower Area

    Inspected by Troy Crews

  112. Aug 29, 2018

    Passed: Building - Framing

    Approved As Requested

    Inspected by Troy Crews

  113. Aug 29, 2018

    Passed: Building - Rated Assembly Fastening

    Approved As Requested

    Inspected by Troy Crews

  114. Aug 29, 2018

    Passed: Fire - Aboveground Sprinkler - Visual (On Site)

    Inspected by Josh Wehinger

  115. Aug 30, 2018

    Passed: Building - Framing

    Approved As Requested

    Inspected by Troy Crews

  116. Aug 30, 2018

    Passed: Building - Above Ceiling

    Approved As Requested

    Inspected by Troy Crews

  117. Aug 30, 2018

    Passed: Electrical - Rough In

    Approved As Requested

    Inspected by Troy Crews

  118. Aug 30, 2018

    Passed: Electrical - Above Ceiling

    Approved As Requested

    Inspected by Troy Crews

  119. Aug 30, 2018

    Passed: Mechanical - Above Ceiling

    Approved As Requested

    Inspected by Troy Crews

  120. Aug 30, 2018

    Passed: Mechanical - Rough In

    Approved As Requested

    Inspected by Troy Crews

  121. Aug 31, 2018

    Passed: Building - Roof Decking

    Approved As Requested

    Inspected by Troy Crews

  122. Aug 31, 2018

    Passed: Plumbing/Gas - Rain Leader

    Approved As Requested

    Inspected by Troy Crews

  123. Sep 12, 2018

    Passed: Building - Framing

    Approved As Requested

    Inspected by Troy Crews

  124. Sep 12, 2018

    Passed: Building - Above Ceiling

    Inspected by Troy Crews

  125. Sep 12, 2018

    Passed: Building - Insulation

    Inspected by Troy Crews

  126. Sep 13, 2018

    Passed: Electrical - Rough In

    Approved As Requested

    Inspected by Troy Crews

  127. Sep 13, 2018

    Passed: Electrical - Above Ceiling

    Approved As Requested

    Inspected by Troy Crews

  128. Sep 13, 2018

    Passed: Mechanical - Above Ceiling

    Approved As Requested

    Inspected by Troy Crews

  129. Sep 13, 2018

    Passed: Mechanical - Rough In

    Approved As Requested

    Inspected by Troy Crews

  130. Sep 13, 2018

    Passed: Plumbing/Gas - Water Pipe

    Approved As Requested

    Inspected by Troy Crews

  131. Sep 16, 2018

    Passed: Fire - Aboveground Sprinkler - Visual (On Site)

    Inspected by Josh Wehinger

  132. Sep 18, 2018

    Passed: Building - Rated Assembly Fastening

    Approved As Requested Zone 1

    Inspected by Troy Crews

  133. Sep 20, 2018

    Passed: Plumbing/Gas - Water Pipe

    Approved As Requested 100 P.si.

    Inspected by Troy Crews

  134. Sep 21, 2018

    Passed: Building - Framing

    Nw Section

    Inspected by Troy Crews

  135. Sep 21, 2018

    Passed: Building - Insulation

    Nw Section

    Inspected by Troy Crews

  136. Sep 24, 2018

    Passed: Building - Framing

    Approved As Requested

    Inspected by Troy Crews

  137. Sep 26, 2018

    Passed: Building - Rated Assembly Fastening

    Approved As Requested

    Inspected by Troy Crews

  138. Sep 27, 2018

    Passed: Building - Rated Assembly Fastening

    Approved As Requested

    Inspected by Troy Crews

  139. Sep 27, 2018

    Passed: Fire - Aboveground Sprinkler - Visual (On Site)

    Inspected by Josh Wehinger

  140. Oct 3, 2018

    Passed: Building - Framing

    Hard Ceiling Areas

    Inspected by Troy Crews

  141. Oct 3, 2018

    Passed: Building - Above Ceiling

    Hard Ceiling Areas

    Inspected by Troy Crews

  142. Oct 3, 2018

    Passed: Electrical - Rough In

    Hard Ceiling Areas

    Inspected by Troy Crews

  143. Oct 3, 2018

    Passed: Electrical - Above Ceiling

    Hard Ceiling Areas

    Inspected by Troy Crews

  144. Oct 3, 2018

    Passed: Mechanical - Above Ceiling

    Hard Ceiling Areas

    Inspected by Troy Crews

  145. Oct 3, 2018

    Passed: Plumbing/Gas - Rough In

    Hard Ceiling Areas

    Inspected by Troy Crews

  146. Oct 5, 2018

    Failed: Plumbing/Gas - Water Pipe

    Leak 1st Hallway To Left From North Entrance By Bulkhead

    Inspected by Troy Crews

  147. Oct 8, 2018

    Passed: Building - Framing

    Approved As Requested

    Inspected by Troy Crews

  148. Oct 8, 2018

    Passed: Building - Insulation

    Approved As Requested

    Inspected by Troy Crews

  149. Oct 12, 2018

    Passed: Plumbing/Gas - Rain Leader

    4 Primary’s 2 Secondary Full

    Inspected by Troy Crews

  150. Oct 16, 2018

    Passed: Plumbing/Gas - Water Pipe

    90 P.si.

    Inspected by Troy Crews

  151. Oct 18, 2018

    Passed: Building - Rated Assembly Fastening

    Approved As Requested

    Inspected by Troy Crews

  152. Oct 22, 2018

    Passed: Building - Above Ceiling

    Patient Rooms And Center Core

    Inspected by Troy Crews

  153. Oct 22, 2018

    Passed: Electrical - Rough In

    Patient Rooms And Center Core

    Inspected by Troy Crews

  154. Oct 22, 2018

    Passed: Electrical - Above Ceiling

    Patient Rooms And Center Core

    Inspected by Troy Crews

  155. Oct 22, 2018

    Passed: Mechanical - Above Ceiling

    Patient Rooms And Center Core

    Inspected by Troy Crews

  156. Oct 22, 2018

    Passed: Mechanical - Rough In

    Patient Rooms And Center Core

    Inspected by Troy Crews

  157. Oct 22, 2018

    Passed: Mechanical - Framing/Fire Damper

    Patient Rooms And Center Core

    Inspected by Troy Crews

  158. Oct 22, 2018

    Passed: Plumbing/Gas - Rough In

    Patient Rooms And Center Core

    Inspected by Troy Crews

  159. Oct 26, 2018

    Passed: Building - Framing

    Approved As Requested

    Inspected by Troy Crews

  160. Oct 26, 2018

    Passed: Building - Insulation

    Approved As Requested

    Inspected by Troy Crews

  161. Oct 30, 2018

    Passed: Building - Rated Assembly Fastening

    Approved As Requested

    Inspected by Troy Crews

  162. Nov 5, 2018

    Passed: Fire - Aboveground Sprinkler - Visual (On Site)

    Inspected by Josh Wehinger

  163. Nov 7, 2018

    Passed: Building - Framing

    Patient Rooms Hallway Not Complete

    Inspected by Troy Crews

  164. Nov 7, 2018

    Passed: Building - Above Ceiling

    Patient Rooms Hallway Not Complete

    Inspected by Troy Crews

  165. Nov 7, 2018

    Passed: Electrical - Rough In

    Patient Rooms Hallway Not Complete

    Inspected by Troy Crews

  166. Nov 7, 2018

    Passed: Mechanical - Above Ceiling

    Patient Rooms Hallway Not Complete

    Inspected by Troy Crews

  167. Nov 7, 2018

    Passed: Mechanical - Rough In

    Patient Rooms Hallway Not Complete

    Inspected by Troy Crews

  168. Nov 7, 2018

    Passed: Plumbing/Gas - Rough In

    Patient Rooms Hallway Not Complete

    Inspected by Troy Crews

  169. Nov 7, 2018

    Passed: Electrical - Above Ceiling

    Patient Rooms Hallway Not Complete

    Inspected by Troy Crews

  170. Nov 9, 2018

    Rescheduled 11/14/2018:Plumbing/Gas - Water Pipe

    Inspected by Troy Crews

  171. Nov 9, 2018

    Rescheduled 11/14/2018:Plumbing/Gas - Rough In

    Inspected by Troy Crews

  172. Nov 14, 2018

    Passed: Plumbing/Gas - Water Pipe

    Approved As Requested

    Inspected by Troy Crews

  173. Nov 14, 2018

    Passed: Building - Framing

    Approved As Requested

    Inspected by Troy Crews

  174. Nov 14, 2018

    Passed: Building - Insulation

    Approved As Requested

    Inspected by Troy Crews

  175. Nov 26, 2018

    Passed: Building - Rated Assembly Fastening

    Approved As Requested

    Inspected by Troy Crews

  176. Nov 30, 2018

    Passed: Fire - Aboveground Sprinkler - Visual (On Site)

    Inspected by Josh Wehinger

  177. Nov 30, 2018

    Passed: Building - Above Ceiling

    Kitchen Area Hard Ceiling

    Inspected by Troy Crews

  178. Nov 30, 2018

    Passed: Electrical - Above Ceiling

    Kitchen Area Hard Ceiling

    Inspected by Troy Crews

  179. Dec 5, 2018

    Passed: Fire - Kitchen Hood – Fire Suppression Test

    Inspected by Josh Wehinger

  180. Dec 6, 2018

    Passed: Electrical - Permanent Power

    Temp Permanent City Sewer

    Inspected by Troy Crews

  181. Dec 6, 2018

    Release to power company

    Inspected by Troy Crews

  182. Dec 10, 2018

    Passed: Fire - Aboveground Sprinkler - Visual (On Site)

    Inspected by Josh Wehinger

  183. Dec 11, 2018

    Passed: Building - Framing

    Approved As Requested

    Inspected by Troy Crews

  184. Dec 11, 2018

    Passed: Building - Above Ceiling

    Approved As Requested

    Inspected by Troy Crews

  185. Dec 11, 2018

    Passed: Electrical - Rough In

    Approved As Requested

    Inspected by Troy Crews

  186. Dec 11, 2018

    Passed: Electrical - Above Ceiling

    Approved As Requested

    Inspected by Troy Crews

  187. Dec 11, 2018

    Passed: Mechanical - Above Ceiling

    Approved As Requested

    Inspected by Troy Crews

  188. Dec 11, 2018

    Passed: Mechanical - Rough In

    Approved As Requested

    Inspected by Troy Crews

  189. Dec 11, 2018

    Passed: Plumbing/Gas - Water Pipe

    Approved As Requested

    Inspected by Troy Crews

  190. Dec 18, 2018

    Passed: Building - Framing

    Approved As Requested

    Inspected by Troy Crews

  191. Dec 18, 2018

    Passed: Building - Insulation

    Approved As Requested R-38

    Inspected by Troy Crews

  192. Dec 21, 2018

    Passed: Building - Rated Assembly Fastening

    Approved As Requested

    Inspected by Troy Crews

  193. Jan 18, 2019

    Passed: Fire - Aboveground Sprinkler - Visual (On Site)

    Inspected by Tad Cervantes

  194. Jan 18, 2019

    Passed: Fire - Aboveground Hydro - Sprinkler

    Inspected by Tad Cervantes

  195. Jan 22, 2019

    Passed: Fire - Kitchen Hood – Fire Suppression Test

    Inspection Was Preformed On Friday, 1-18-19.

    Inspected by Tad Cervantes

  196. Jan 25, 2019

    Passed: Building - Lath/Stucco

    Approved As Requested

    Inspected by Troy Crews

  197. Feb 1, 2019

    Passed: Plumbing/Gas - Rough In

    Approved As Requested, Suggestion Let City Gas Dept. Look At It Also

    Inspected by Troy Crews

  198. Feb 5, 2019

    Passed: Building - Above Ceiling

    Approved As Requested

    Inspected by Troy Crews

  199. Feb 5, 2019

    Passed: Electrical - Above Ceiling

    Approved As Requested

    Inspected by Troy Crews

  200. Feb 5, 2019

    Passed: Mechanical - Above Ceiling

    Approved As Requested

    Inspected by Troy Crews

  201. Feb 5, 2019

    Passed: Fire - Aboveground Sprinkler - Visual (On Site)

    Inspected by Tad Cervantes

  202. Mar 12, 2019

    Passed: Building - Above Ceiling

    Approved As Requested

    Inspected by Troy Crews

  203. Mar 12, 2019

    Passed: Electrical - Above Ceiling

    Approved As Requested

    Inspected by Troy Crews

  204. Mar 12, 2019

    Passed: Mechanical - Above Ceiling

    Approved As Requested

    Inspected by Troy Crews

  205. Mar 15, 2019

    Passed: Building - Above Ceiling

    Inspected by Troy Crews

  206. Mar 15, 2019

    Failed: Electrical - Above Ceiling

    Few Boxes Still Open

    Inspected by Troy Crews

  207. Mar 15, 2019

    Passed: Mechanical - Above Ceiling

    Inspected by Troy Crews

  208. Apr 5, 2019

    Passed: Building - Above Ceiling

    Approved As Requested

    Inspected by Troy Crews

  209. Apr 5, 2019

    Passed: Electrical - Above Ceiling

    Approved As Requested

    Inspected by Troy Crews

  210. Apr 5, 2019

    Passed: Mechanical - Above Ceiling

    Approved As Requested

    Inspected by Troy Crews

  211. Apr 11, 2019

    Passed: Building - Above Ceiling

    Approved As Requested

    Inspected by Troy Crews

  212. Apr 11, 2019

    Passed: Electrical - Above Ceiling

    Approved As Requested

    Inspected by Troy Crews

  213. Apr 11, 2019

    Passed: Mechanical - Above Ceiling

    Approved As Requested

    Inspected by Troy Crews

  214. Apr 16, 2019

    Passed: Building - Above Ceiling

    Approved As Requested

    Inspected by Troy Crews

  215. Apr 16, 2019

    Passed: Electrical - Above Ceiling

    Inspected by Troy Crews

  216. Apr 16, 2019

    Passed: Mechanical - Above Ceiling

    Inspected by Troy Crews

  217. Apr 26, 2019

    Cancelled: Mechanical - Above Ceiling

    Inspected by Troy Crews

  218. Apr 26, 2019

    Cancelled: Mechanical - Rough In

    Inspected by Troy Crews

  219. Apr 26, 2019

    Cancelled: Mechanical - Pipe Pressure Test

    Inspected by Troy Crews

  220. Apr 29, 2019

    Failed: Fire - Fire Final

    Inspection Was Not Performed On This Day. A Walk-thru With Supervisor Was Performed On Life Safety Issues That He Had. Issues Are Being Resolved And A Final Inspection Will Follow Shortly. Tjc

    Inspected by Tad Cervantes

  221. May 3, 2019

    Passed: Fire - Kitchen Hood – Fire Suppression Test

    Inspected by Tad Cervantes

  222. May 3, 2019

    Passed: Fire - Fire Final

    Inspected by Tad Cervantes

  223. May 9, 2019

    Passed: Building - Final

    Rooftop Areas A.c. Units And Service Plugs

    Inspected by Troy Crews

  224. May 15, 2019

    Passed: Building - Final

    Release Of C.o. Pending Site Final, And Final Walkthrough

    Inspected by Troy Crews

  225. May 24, 2019

    Passed: Engineering - Zoning Final

    Meets Revisions Inspected On 5/3/19

    Inspected by Brandon Stubbs

Documents