Permit Details

Permit Search

Permit

New Residential Construction

286 SW RED MAPLE WAY
LAKE CITY, FL 32024

Permit #
000036050
Application #
36239
Status Completed
  1. Submitted Dec 1, 2017
  2. Issued Oct 21, 2020
  3. Expires Oct 27, 2021
  4. Completed May 3, 2021

Property

Parcel #
02732-107
Owner
Harrington Land Trust,vii
Acres
0.59
Subdivision
Laurel Lake
Zoning
RSF-2
Flood zone
X
District
3

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Finished floor requirement
Fema map number
12023C0290D
This is the construction of a
SFD/UTILITY
Setbacks Front
25.00
Setback Side 1
10.00
Setback Side 2
10.00
Setbacks Rear
15.00
Heated Area (Sqft)
2340.00
Total Area (Sqft)
3483.00
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
Single Family Dwelling
Building Code Edition
Florida Building Code 2017 6th Edition & 2014 National Electrical Code
Septic# (00-0000) or (X00-000)
X-CITY

Status & Review History

  1. Permit Renewed
  2. Permit Renewed

Contractors

  • John D. Harrington,jr.

    License
    CGC1516998
    Title
    —
    Role
    —

Inspections

  1. Feb 15, 2018

    Passed: Building - Footer

    Inspected by Troy Crews

  2. Feb 15, 2018

    Passed: Engineering - Setbacks

    Inspected by Troy Crews

  3. Apr 3, 2018

    Passed: Plumbing/Gas - Rough In

    Inspected by Tommy Matthews

  4. Apr 10, 2018

    Passed: Building - Slab

    Inspected by Troy Crews

  5. May 2, 2018

    Passed: Building - Lintel/Tie Beam

    Inspected by Troy Crews

  6. May 18, 2018

    Passed: Building - Roof Decking

    Partial. Exclude Front Porch,rear Portion At Top Near Peak

    Inspected by Tommy Matthews

  7. May 23, 2018

    Passed: Building - Roof Decking

    Inspected by Troy Crews

  8. Jul 18, 2018

    Release to power company

    Corrected Power Company

    Inspected by Laurie Hodson

  9. Jul 18, 2018

    Passed: Electrical - Temporary Service

    Inspected by Troy Crews

  10. Jul 18, 2018

    Release to power company

    Inspected by Troy Crews

  11. Oct 15, 2018

    Failed: Building - Framing

    Need To Strap Trusses T-24 T-25 And T-26 At Interior Wall Bearing Point

    Inspected by Troy Crews

  12. Oct 15, 2018

    Passed: Electrical - Rough In

    Inspected by Troy Crews

  13. Oct 15, 2018

    Passed: Mechanical - Rough In

    Inspected by Troy Crews

  14. Oct 15, 2018

    Failed: Plumbing/Gas - Rough In

    P-trap Washing Machine Line ?

    Inspected by Troy Crews

  15. Oct 18, 2018

    Cancelled: Mechanical - Rough In

    Inspected by Troy Crews

  16. Oct 18, 2018

    Failed: Plumbing/Gas - Rough In

    P-trap Washing Machine Drain ?

    Inspected by Troy Crews

  17. Oct 19, 2018

    Passed: Building - Framing

    Straps Installed

    Inspected by Troy Crews

  18. Oct 24, 2018

    Passed: Plumbing/Gas - Rough In

    P Trap Under Slab For Washer Per Plumber

    Inspected by Troy Crews

  19. Oct 31, 2019

    Electrical -Permanent Power

    Inspected by Troy Crews

  20. Oct 31, 2019

    Release to power company

    Inspected by Troy Crews

  21. Feb 19, 2020

    Release to power company

  22. Jul 7, 2020

    Release to power company

    Resent To Power Company

    Inspected by Laurie Hodson

  23. Apr 23, 2021

    Failed: Building - Final

    Need Tie Down Clips On Air Condenser Unit, Blower Door Test, Final Termite Treatment, Remove Limb For Access To Garage.

    Inspected by Troy Crews

  24. Apr 30, 2021

    Passed: Building - Final

    Blower Door Received, Termite Sticker On Panel. Items Corrected

    Inspected by Troy Crews