Permit Details

Permit Search

Permit

New Residential Construction

369 SW BUFFALO CT
FORT WHITE, FL 32038

Permit #
000056258
Application #
76475
Status Termite Treatment - Final was not accepted.
  1. Submitted Jul 20, 2026
  2. Issued Aug 4, 2026
  3. Expires Aug 4, 2027
  4. Completed —

Property

Parcel #
03935-022
Owner
Humphreys John Gerald Marcus,
Acres
5.01
Subdivision
Arrow Head Acres
Zoning
A-3
Flood zone
X
District
4

Permit

Status
Termite Treatment - Final was not accepted.
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Minimum Requirement
Finished floor requirement
One foot above the road
Fema map number
12023C0485C
This is the construction of a
Single Family Dwelling
Setbacks Front
30'
Setback Side 1
25'
Setback Side 2
25'
Setbacks Rear
25'
Stories
1
Heated Area (Sqft)
1120
Total Area (Sqft)
1312
Building Height
9
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
SINGLE FAMILY DWELLING
Building Code Edition
2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Septic# (00-0000) or (X00-000)
26-0466
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition)
a self-adhering polymer-modified bitumen underlayment complying with ASTM D1970 applied over the entire roof.
Service Amps
200

Status & Review History

  1. Application pending.
  2. Application Status Update Notification
  3. Application Status Update Notification
  4. Architectural Plans was not accepted.
  5. Architectural Plans was not accepted.
  6. Application Status Update Notification
  7. Application Status Update Notification
  8. Application Status Update Notification
  9. Application Status Update Notification
  10. Application Status Update Notification
  11. Application Status Update Notification
  12. Application Status Update Notification
  13. Application Status Update Notification
  14. Application Status Update Notification
  15. Application Status Update Notification
  16. Submitted by building department on applicant's behalf
  17. Application Status Update Notification
  18. Application Status Update Notification
  19. Permit Issued
  20. Termite Treatment - Final was not accepted.

Contractors

  • Steven M Ayoub

    Ayoub Construction Corp

    License
    CBC1269058
    Title
    Cert. Building
    Role
    Contractor

    County License & Workers Comp Expired.

  • Donald Davis

    High Springs Electric Inc

    License
    EC0002306
    Title
    Electrical Contractor
    Role
    Subcontractor
  • Loren B Walbaum

    All-rite Heating & Air Conditioning,inc.

    License
    CMC1249660
    Title
    Mechanical Contractor
    Role
    Subcontractor

    County License & State License Expired.

  • Jeffrey D Kempton

    Kempton & Self Plumbing Service Inc

    License
    CFC057773
    Title
    Plumbing Contractor
    Role
    Subcontractor

    Liability Insurance Expired.

  • Shawn Raba

    Done Right Roofing Inc.

    License
    CCC1333916
    Title
    Cert. Roofing
    Role
    Subcontractor

    County License & State License & Liability Insurance & Workers Comp Expired.

  1. Jun 26, 2026

    Septic Release Inspection

    Inspected by Health Dept

  2. Aug 6, 2026

    Passed: Building - Footer

    2#5 Rebar On Chais With Turn Ups For Block All Wired

    Inspected by Gary Pitzer

  3. Aug 6, 2026

    Passed: Electrical - Footer Steel & Grounding

    Footer Steel Bonded

    Inspected by Gary Pitzer

  4. Aug 6, 2026

    Passed: Engineering - Setbacks

    Appears To Be With Plan, No Markers

    Inspected by Gary Pitzer

  5. Aug 21, 2026

    Passed: Electrical - 1st Underground Rough–In

    Inspected by Gary Pitzer

  6. Aug 21, 2026

    Passed: Plumbing/Gas - 1st Underground Rough–In

    Dwv, Nl Clean Out, And Copper Lines Under Slab With Plastic Sleeves Over Pipes

    Inspected by Gary Pitzer

  7. Sep 2, 2026

    Passed: Building - Slab

    Termite, Compaction Reports And Photos Of Slab Above Grade On File

    Inspected by Gary Pitzer

  8. Sep 16, 2026

    Passed: Building - Lintel/Tie Beam

    Inspected by Gary Pitzer

  9. Sep 30, 2026

    Passed: Building - Roof Decking

    Inspected by Troy Crews

  10. Nov 17, 2026

    Passed: Building - Insulation

    Inspected by Gary Pitzer

  11. Nov 17, 2026

    Passed: Plumbing/Gas - Tub Set/Shower Pan

    Inspected by Gary Pitzer

  12. Nov 17, 2026

    Passed: Electrical - 2nd Rough-In

    Inspected by Gary Pitzer

  13. Nov 17, 2026

    Passed: Building - Framing

    Inspected by Gary Pitzer

  14. Nov 17, 2026

    Passed: Building - Ext Strapping/Wall Sheathing

    Inspected by Gary Pitzer

  15. Nov 17, 2026

    Passed: Building - Wall Sheathing

    Block

    Inspected by Gary Pitzer

  16. Nov 17, 2026

    Passed: Plumbing/Gas - 2nd Rough-In

    Inspected by Gary Pitzer

  17. Nov 17, 2026

    Passed: Mechanical - Rough In

    Bath Vents Only, This Will Be Split Systems And Will Be Installed At Final

    Inspected by Gary Pitzer

Documents