Permit Details

Permit Search

Permit

Storage Building

1070 SW MAULDIN AVE
LAKE CITY, FL 32024

Permit #
000056107
Application #
76854
Status Completed
  1. Submitted Jul 9, 2026
  2. Issued Jul 16, 2026
  3. Expires Apr 11, 2027
  4. Completed Oct 13, 2026

Property

Parcel #
03265-101
Owner
Perry Vernon, Perry Teresa
Acres
4.99
Subdivision
Mauldin Woodlands Phase 1
Zoning
A-3
Flood zone
X
District
2

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Accessory Use
Finished floor requirement
Non-Habitable Structure
Fema map number
12023C0379C
Type of Structure
Garage
Commercial or Residential?
Residential
Total Area (Sqft)
3444
Septic# (00-0000) or (X00-000)
26-0485
Setbacks Front
30'
Setback Side 1
25'
Setback Side 2
25'
Setback Rear
25'
Building Code Construction Type
III
Building Code Element
B
Building Code Occupancy Types
Storage
Occupancy Use Title
NON-HABITABLE STRUCTURE
Building Code Edition
2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Building Height
12/8
Building Length
82
Building Width
42
Service Amps
200
Slab
New
Mechanical
Yes
Electrical
Yes
Plumbing
Yes

Status & Review History

  1. Application pending.
  2. Application Status Update Notification
  3. Application Status Update Notification
  4. Application Status Update Notification
  5. Application Status Update Notification
  6. Application Status Update Notification
  7. Subcontractor Form was not accepted.
  8. Submitted by building department on applicant's behalf
  9. Application Status Update Notification
  10. Permit Issued

Contractors

This is an owner-builder project.

Inspections

  1. Jul 1, 2026

    Septic Release Inspection

    Inspected by Health Dept

  2. Sep 1, 2026

    Failed: Building - Final

    No Access Gated And Dogs Loose, Please Have Gates Open And Dogs Put Up At Next Inspection, Reshuele

    Inspected by Gary Pitzer

  3. Sep 28, 2026

    Failed: Electrical - Permanent Power

    1.grounding Conductor To Rods And Sub Panel Does Not Appear To Be The Proper Size 2.ground Rods Need To Be Minu 6 Ft Apart. 3. Need Ground Bar Attached To Metal Sub Panel

    Inspected by Gary Pitzer

  4. Sep 29, 2026

    Passed: Electrical - Permanent Power

    Inspected by Gary Pitzer

  5. Sep 29, 2026

    Release to power company

    Inspected by Gary Pitzer

  6. Oct 13, 2026

    Passed: Building - Final

    Inspected by Troy Crews