Permit Details

Permit Search

Permit

Roof Replacement or Repair

126 SE IBIS WAY
LAKE CITY, FL 32025

Permit #
000055889
Application #
76622
Status Completed
  1. Submitted Jun 4, 2026
  2. Issued Jun 11, 2026
  3. Expires Dec 29, 2026
  4. Completed Jul 2, 2026

Property

Parcel #
07592-663
Owner
Herren William,
Acres
0.14
Subdivision
Eastside Village Unit 6
Zoning
RMF-1
Flood zone
X
District
4

Permit

Status
Completed
Septic release
N/A
Related permit
—

Job Details

Finished floor requirement
Fema map number
12023C0311D
Type Roofing Job
Replacement - Tear off Existing and Replace
Further Job Details (Explain if decking is being replaced and or Repairs are being done.)
Re-roofing | No structural modification | A standard tear-off and proper disposal of one to two layers of existing asphalt shingles. Once the deck is cleared, will inspect the structural sheathing and furnish and install new OSB (Oriented Strand Board) decking where applicable to replace any damaged or rotted sections. To prepare the repaired deck for the final roof system, a premium synthetic underlayment will be mechanically attached, and a protective ice and water shield will be installed where applicable. The structural repairs and preparation will be finalized by properly venting the roof to ensure code compliance.
Type of structure
House
Commercial or Residential
Residential
Roof Area (for this job) Sq Ft
2333
No. of Stories
1
Roof Pitch
4:12 or Greater
Is the existing roof being removed?
Yes
Type of New Roofing Product
Asphalt Shingles
Florida Product Approval Number
FL30310.1
Product Manufacturer
IKO DYNASTY FG / IKO Industries Ltd
Product Description
ASTM D 3161, Class F asphalt shingles, hip and ridge shingles, starter strip & shingle strip
Building Code Edition
2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Sealed roof decking options: (Must select an option.)
two layers of felt underlayment comply ASTM 0226 Type II or ASTM D4869 Type Ill or IV, or two layers of a synthetic underlayment meeting the performance requirements specified, lapped and fastened as specified.
Ventilation:
Ridge Vent
Flashing:
Replace with Step Flashing
Drip Edge:
Replace All
Valley Treatment:
New Metal
Any cable and/or race-way wiring located on or within the roof assembly?
No

Status & Review History

  1. Application pending.
  2. Application submitted by applicant.
  3. City of Lake City Utilities Notified.
  4. Application Status Update Notification
  5. Application submitted by applicant.
  6. Application submitted by applicant.
  7. Application Status Update Notification
  8. Application Status Update Notification
  9. Permit Issued

Contractors

  • Robert Rozanski

    Erie Construction Mid-west Llc

    License
    CCC1336152
    Title
    Cert. Roofing
    Role
    Contractor

Inspections

  1. Jun 18, 2026

    Rescheduled 6/22/2026:Re-Roof - Roof Affidavit Review

    Inspected by Tcrews

  2. Jun 22, 2026

    Passed: Re-Roof - In Progress

    Inspected by Christian Allen

  3. Jun 22, 2026

    Passed: Re-Roof - Roof Affidavit Review

    Inspected by Christian Allen

  4. Jul 1, 2026

    Passed: Re-Roof - Roof Pictures Review

    Inspected by Troy Crews

  5. Jul 2, 2026

    Passed: Re-Roof - Final

    Inspected by Troy Crews

Documents