Permit

New Residential Construction

274 SW BLANTON LN
LAKE CITY, FL 32024

Permit #
000055604
Application #
75906
Status Completed
  1. Submitted May 4, 2026
  2. Issued May 5, 2026
  3. Expires May 16, 2027
  4. Completed Nov 17, 2026

Property

Parcel #
00363-210
Owner
Oxley Donald, Oxley Ileana
Acres
5.00
Subdivision
Pinemount Meadows
Zoning
A-3
Flood zone
X
District
2

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Engineers Elevation Letter
Finished floor requirement
12" ABOVE THE ADJACENT GROUND FOR THE ENTIRE PERIMETER NA
Requirement needed
By Nailing Inspection
Document needed is
Upload Photos
Document receieved
Yes
Fema map number
12023C0270C
This is the construction of a
Single Family Dwelling
Setbacks Front
30'
Setback Side 1
25'
Setback Side 2
25'
Setbacks Rear
25'
Stories
1
Heated Area (Sqft)
2247
Total Area (Sqft)
3213
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
SINGLE FAMILY DWELLING
Building Code Edition
2023 FLORIDA BUILDING CODE 8TH EDITION AND 2020 NATIONAL ELECTRICAL CODE
Septic# (00-0000) or (X00-000)
26-0256
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition)
a minimum 4-inch wide strip of selfadhering polymer-modified bitumen complying with ASTM D1970 or a minimum 3 ¾ - inch wide strip of selfadhering flexible flashing tape complying with AAMA 711, applied over all joints in the roof decking. A felt underlayment complying with ASTM D226 Type II, ASTM D4869 Type Ill or IV, or ASTM D6757, or a synthetic underlayment meeting the performance requirements specified, is required to be applied over the strips/tape over the entire roof.
Service Amps
200

Status & Review History

  1. Application pending.
  2. Recorded Notice of Commencement was not accepted.
  3. Application Status Update Notification
  4. Application Status Update Notification
  5. Submitted by building department on applicant's behalf
  6. Application Status Update Notification
  7. Permit Issued

Contractors

  • Bryan Zecher

    Bryan Zecher Homes Inc

    License
    CBC1257343
    Title
    Building Contractor
    Role
    Contractor
  • Donald Hollingsworth Ii

    Holly Electric Inc

    License
    EC13012104
    Title
    Cert. Electrical
    Role
    Subcontractor
  • Anthony R Franks

    Lane Heating & Air Llc

    License
    CAC1818631
    Title
    Cert. A/c Class “b”
    Role
    Subcontractor

    County License & State License Expired.

  • Daniel Byrd

    Byrds Eye Roofing Inc

    License
    CCC1332899
    Title
    Cert. Roofing
    Role
    Subcontractor
  • Cody Barrs

    Barrs Plumbing Inc

    License
    CFC1427145
    Title
    Plumbing Contractor
    Role
    Subcontractor

Inspections

  1. May 7, 2026

    Passed: Building - Footer

    Inspected by Matt Forsyth

  2. May 7, 2026

    Passed: Engineering - Setbacks

    Inspected by Matt Forsyth

  3. May 7, 2026

    Passed: Electrical - Footer Steel & Grounding

    Inspected by Matt Forsyth

  4. May 15, 2026

    Passed: Electrical - Temporary Power Service

    Inspected by Matt Forsyth

  5. May 20, 2026

    Release to power company

    Inspected by Mgarber

  6. May 21, 2026

    Passed: Plumbing/Gas - 1st Underground Rough–In

    Inspected by Matt Forsyth

  7. Jun 1, 2026

    Passed: Building - Slab

    Inspected by Matt Forsyth

  8. Jul 7, 2026

    Passed: Building - Roof Decking

    Inspected by Matt Forsyth

  9. Jul 7, 2026

    Passed: Building - Wall Sheathing

    Windstorm

    Inspected by Matt Forsyth

  10. Jul 17, 2026

    Passed: Building - Framing

    Inspected by Matt Forsyth

  11. Jul 31, 2026

    Passed: Mechanical - Rough In

    Inspected by Matt Forsyth

  12. Jul 31, 2026

    Passed: Electrical - 2nd Rough-In

    Inspected by Matt Forsyth

  13. Jul 31, 2026

    Passed: Plumbing/Gas - 2nd Rough-In

    Inspected by Matt Forsyth

  14. Jul 31, 2026

    Passed: Plumbing/Gas - Tub Set/Shower Pan

    Inspected by Matt Forsyth

  15. Aug 6, 2026

    Passed: Building - Insulation

    Inspected by Matt Forsyth

  16. Aug 18, 2026

    Passed: Building - Ext Strapping/Wall Sheathing

    Inspected by Matt Forsyth

  17. Sep 29, 2026

    Passed: Electrical - Permanent Power

    Septic Final Needed

    Inspected by Matt Forsyth

  18. Sep 30, 2026

    Septic Release Inspection

    Inspected by Health Dept

  19. Oct 2, 2026

    Release to power company

    Inspected by Alaw

  20. Nov 16, 2026

    Passed: Building - Final

    Inspected by Matt Forsyth

  21. Nov 17, 2026

    Passed: Planning and Zoning Review - Elevation Confirmation

    Inspected by Karen Aiken-smoot