| Passed: Fire - Plan Review |
|
Cpt. Shane Overstreet |
3/6/2026 |
| Passed: Building - Monolithic Slab |
Four Interior Footers As Per Plan |
Troy Crews |
4/30/2026 |
| Cancelled: Building - Slab |
|
Tcrews |
5/4/2026 |
| Passed: Electrical - 1st Underground Rough–In |
|
Troy Crews |
5/4/2026 |
| Passed: Plumbing/Gas - 1st Underground Rough–In |
|
Troy Crews |
5/4/2026 |
| Passed: Building - Footer |
|
Troy Crews |
5/5/2026 |
| Passed: Building - Monolithic Slab |
|
Troy Crews |
5/5/2026 |
| Passed: Building - Slab |
Mono For Dumpster Enclosure And Water Tank |
Troy Crews |
5/21/2026 |
| Passed: Building - Insulation |
Three Walls And Roof |
Troy Crews |
5/29/2026 |
| Passed: Building - Lintel/Tie Beam |
Front Wall Of Store And Dumpster Enclosure |
Troy Crews |
6/5/2026 |
| Passed: Building - Framing |
|
Troy Crews |
6/8/2026 |
| Passed: Electrical - 2nd Rough-In |
|
Troy Crews |
6/8/2026 |
| Failed: Plumbing/Gas - 2nd Rough-In |
Not Complete |
Troy Crews |
6/8/2026 |
| Passed: Plumbing/Gas - 2nd Rough-In |
|
Troy Crews |
6/11/2026 |
| Passed: Mechanical - Rough In |
Bath Fan And Hvac Ducts For Bathroom Areas |
Troy Crews |
6/16/2026 |
| Passed: Building - Roof Decking |
5 8 Type X Sheetrock On Firewall For Storage Room |
Troy Crews |
6/23/2026 |
| Passed: Electrical - Permanent Power |
Need Septic Final For Release |
Troy Crews |
7/8/2026 |
| Passed: Fire - Fire Final |
|
Cpt. S Overstreet |
7/14/2026 |
| Release to power company |
Partial Ok For Septic (see Email In Docs)-- No Co To Be Issued Until Septic Final Rec'd-7.20.26 Mg |
Mgarber |
7/20/2026 |
| Submitted Power Release through FPL Portal |
|
Garber, Melissa |
7/20/2026 |
| Passed: Building - Final |
I Don't From Dot On Driveway For Completion Of Co Store Is Ready For Employees Only And Stocking |
Troy Crews |
7/31/2026 |
| Passed: Fire - Fire Final |
|
Cpt. S Overstreet |
7/31/2026 |
| Passed: Engineering - Zoning Final |
Inspection Completed By Seth Lane. |
Karen Aiken-smoot |
7/31/2026 |
| Passed: Engineering - Zoning Final |
|
Seth Lane |
7/31/2026 |
| Passed: Engineering - D.O.T Final Driveway |
|
Justin Sandlin |
8/6/2026 |
| Septic Release Inspection |
|
Health Dept |
8/7/2026 |