Permit Details

Permit Search

Permit

Mobile Home

8484 SW STATE ROAD 47
LAKE CITY, FL 32024

Permit #
000055448
Application #
75670
Status Completed
  1. Submitted Apr 1, 2026
  2. Issued Apr 9, 2026
  3. Expires Nov 8, 2026
  4. Completed May 12, 2026

Property

Parcel #
03529-135
Owner
Parton Amber,
Acres
1.02
Subdivision
Columbia Estates
Zoning
ESA-2
Flood zone
X
District
2

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Minimum Requirement
Finished floor requirement
Bottom of lowest beam must be one foot above the road
Fema map number
12023C0379C
Mobile Home is a:
Double Wide
Year Built
2026
Width (Ft.In)
32
Length (Ft.In)
72
Driveway access to home:
Existing Drive
Installation Decal #
127198
Septic #
26-0072
Setbacks Front
30'
Setback Side 1
25'
Setbacks Rear
25'
Setback Side 2
25'
Are you applying for a 5 year temporary permit?
No
Serial #
LOHGA20041199AB
Wind Zone?
2
Residential or Commercial Use?
Residential
Service Amps
200
How many of bedrooms does this home have?
5
How many bathrooms does this home have?
3

Status & Review History

  1. Application pending.
  2. Application Status Update Notification
  3. Submitted by building department on applicant's behalf
  4. Permit Issued

Contractors

  • David Albright

    David Albright Mobile Home Svc Llc

    License
    IH1129420
    Title
    Mh Installer (ih)
    Role
    Contractor
  • Glenn Whittington

    Whittington Electric Inc

    License
    EC13002957
    Title
    Electrical Contractor
    Role
    Subcontractor
  • Timothy D Shatto

    Shatto Heating & Air, Inc.

    License
    CAC057875
    Title
    A/c Class B
    Role
    Subcontractor

Inspections

  1. May 6, 2026

    Passed: Mobile Home - Mobile Home Set-Up Final

    Inspector Confirmed Old Mobile Home Has Been Removed-- All Requirements Met To Release Power And Co-- 5.12.26 Mg

    Inspected by Troy Crews

  2. May 6, 2026

    Passed: Engineering - Setbacks

    Inspected by Troy Crews

  3. May 12, 2026

    Release to power company

    Inspected by Ewilliams

  4. May 12, 2026

    Release to power company

    Inspected by Mgarber

  5. May 12, 2026

    Passed: Engineering - D.O.T Final Driveway

    Inspected by Brad Long

  6. May 12, 2026

    Septic Release Inspection

    Inspected by Health Dept

  7. Requested

    Engineering - D.O.T Final Driveway

    Awaiting inspection