Permit Details

Permit Search

Permit

Mobile Home

269 SE RIPLEY PL
LAKE CITY, FL 32024

Permit #
000055288
Application #
75251
Status Completed
  1. Submitted Mar 20, 2026
  2. Issued Mar 20, 2026
  3. Expires Oct 26, 2026
  4. Completed May 5, 2026

Property

Parcel #
09784-103
Owner
Samuel Michael S, Samuel Pollyann M
Acres
6.17
Subdivision
Shadow Wood Unit 2
Zoning
A-3
Flood zone
X
District
4

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Minimum Requirement
Finished floor requirement
Bottom of lowest beam must be one foot above the road
Fema map number
12023C0505C
Mobile Home is a:
Double Wide
Year Built
2026
Width (Ft.In)
28
Length (Ft.In)
44
Driveway access to home:
Existing Drive
Installation Decal #
125985
Special temporary use permit number:
STU260208
Septic #
26-0145
Setbacks Front
30'
Setback Side 1
25'
Setbacks Rear
25'
Setback Side 2
25'
Are you applying for a 5 year temporary permit?
Yes
Serial #
FLTHLCT28195H-5015AB
Wind Zone?
2
Residential or Commercial Use?
Residential
Service Amps
200
How many of bedrooms does this home have?
3
How many bathrooms does this home have?
2

Status & Review History

  1. Application pending.
  2. Application Status Update Notification
  3. Application Status Update Notification
  4. Application Status Update Notification
  5. MH Installer Authorization was not accepted.
  6. Submitted by building department on applicant's behalf
  7. Application Status Update Notification
  8. Permit Issued

Contractors

  • Donald Davis

    High Springs Electric Inc

    License
    EC0002306
    Title
    Electrical Contractor
    Role
    Subcontractor
  • Donald R Davis

    High Springs Electric Inc

    License
    CAC1815367
    Title
    Class B A/c
    Role
    Subcontractor
  • John Harden

    Jh Contracting Llc

    License
    IH1150540
    Title
    Mh Installer (ih)
    Role
    Subcontractor

    Liability Insurance & Workers Comp Expired.

Inspections

  1. Apr 29, 2026

    Passed: Mobile Home - Mobile Home Set-Up Final

    *all Requirements Met To Release Co-- 5.5.26 Mg

    Inspected by Troy Crews

  2. Apr 29, 2026

    Passed: Engineering - Setbacks

    Inspected by Troy Crews

  3. May 5, 2026

    Release to power company

    All Requirements Met To Release Power-- 5.5.26 Mg

    Inspected by Mgarber

  4. May 5, 2026

    Septic Release Inspection

    Inspected by Health Dept