Permit Details

Permit Search

Permit

New Residential Construction

401 NW NOEGEL RD
LAKE CITY, FL 32055

Permit #
000055232
Application #
74781
Status Permit Issued
  1. Submitted Mar 10, 2026
  2. Issued Mar 13, 2026
  3. Expires Jan 31, 2027
  4. Completed —

Property

Parcel #
02398-301
Owner
Spates Maurice, Spates Cassandra
Acres
4.89
Subdivision
Fairfield Estates
Zoning
A-3
Flood zone
X
District
3

Permit

Status
Permit Issued
Septic release
Not yet released
Related permit
—

Job Details

Elevation regulation
Minimum Requirement
Finished floor requirement
One foot above the road
Fema map number
12023C0260C
This is the construction of a
Single Family Dwelling
Setbacks Front
30'
Setback Side 1
25'
Setback Side 2
25'
Setbacks Rear
25'
Stories
1
Heated Area (Sqft)
2412
Total Area (Sqft)
3774
Building Height
22
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
single family dwelling
Building Code Edition
2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Septic# (00-0000) or (X00-000)
26-0153
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition)
a minimum 4-inch wide strip of selfadhering polymer-modified bitumen complying with ASTM D1970 or a minimum 3 ¾ - inch wide strip of selfadhering flexible flashing tape complying with AAMA 711, applied over all joints in the roof decking. A felt underlayment complying with ASTM D226 Type II, ASTM D4869 Type Ill or IV, or ASTM D6757, or a synthetic underlayment meeting the performance requirements specified, is required to be applied over the strips/tape over the entire roof.
Service Amps
200

Status & Review History

  1. Application pending.
  2. Application Status Update Notification
  3. Application Status Update Notification
  4. Application Status Update Notification
  5. Application Status Update Notification
  6. Application Status Update Notification
  7. Application Status Update Notification
  8. Application Status Update Notification
  9. Application Status Update Notification
  10. Application Status Update Notification
  11. Submitted by building department on applicant's behalf
  12. Application Status Update Notification
  13. Permit Issued

Contractors

  • Ronnie Edenfield

    Scci Inc

    License
    CBC1267457
    Title
    Cert. Building
    Role
    Contractor
  • Donald Davis

    High Springs Electric Inc

    License
    EC0002306
    Title
    Electrical Contractor
    Role
    Subcontractor
  • Donald R Davis

    High Springs Electric Inc

    License
    CAC1815367
    Title
    Class B A/c
    Role
    Subcontractor
  • Ralph W Laverdure

    Rwl Roofing Llc

    License
    CCC1328590
    Title
    Roofing Contractor
    Role
    Subcontractor

    County License & State License & Liability Insurance & Workers Comp Expired.

  • Don C Bills Sr

    Hometown Plumbing Services Llc

    License
    CFC1428890
    Title
    Plumbing Contractor
    Role
    Contractor
  1. Mar 13, 2026

    Passed: Building - Footer

    Inspected by Matt Forsyth

  2. Mar 13, 2026

    Passed: Electrical - Footer Steel & Grounding

    Inspected by Matt Forsyth

  3. Apr 9, 2026

    Passed: Plumbing/Gas - 1st Underground Rough–In

    Waste Lines Only

    Inspected by Troy Crews

  4. Apr 20, 2026

    Passed: Building - Slab

    Inspected by Matt Forsyth

  5. May 11, 2026

    Passed: Building - Wall Sheathing

    Masonry Wall. ,steel Inspection Ports Clean

    Inspected by Matt Forsyth

  6. Jun 8, 2026

    Passed: Building - Ext Strapping/Wall Sheathing

    Inspected by Matt Forsyth

  7. Jun 8, 2026

    Passed: Building - Roof Decking

    Inspected by Matt Forsyth

  8. Jun 25, 2026

    Passed: Building - Framing

    Windows And Doors Not Installed

    Inspected by Matt Forsyth

  9. Jun 25, 2026

    Failed: Electrical - 2nd Rough-In

    Need Access To Wire Splices In Attic

    Inspected by Matt Forsyth

  10. Jun 25, 2026

    Passed: Plumbing/Gas - 2nd Rough-In

    Stand Off Block At Toilet Suggested Supply Line

    Inspected by Matt Forsyth

  11. Jun 25, 2026

    Passed: Mechanical - Rough In

    Inspected by Matt Forsyth

  12. Jun 25, 2026

    Passed: Electrical - Temporary Power Service

    Inspected by Matt Forsyth

  13. Aug 4, 2026

    Release to power company

    Re-release, Never Popped Up In Fpl Tab

    Inspected by Ewilliams

  14. Aug 4, 2026

    Passed: Electrical - 2nd Rough-In

    Inspected by Matt Forsyth

  15. Aug 4, 2026

    Passed: Building - Insulation

    Attic Access In Hall

    Inspected by Matt Forsyth

  16. Aug 4, 2026

    Submitted Power Release through FPL Portal

    Inspected by Ward, Emaleigh C.