Right-of-Way Access/Driveway
Permit
| Address |
SW SILOAM ST , |
| Parcel #: |
00439-104 |
| Acres: | 0.00 |
| Owner: | Simpson Britnee A, |
| Subdivision: | Siloam Crossing |
| Zoning: | |
| Flood Zone: | |
| District: | |
| Application #: | 75388 |
| Permit #: |
000055214 |
| Related Permit: |
|
| Submitted: | Tuesday, March 3, 2026 |
| Issued: | Wednesday, March 11, 2026 |
| Expires: | Friday, May 1, 2026 |
| Completed: | Friday, May 1, 2026 |
| Status: |
Completed |
| Septic Release? |
N/A |
Job Details
| Finished floor requirement |
|
| Standards |
Shall conform to Public Works Determinations as stated below |
| Requirements |
An 18” storm pipe of approved material is required with a minimum length of 32 feet. 4” Concrete Pads shall be located on each mitered end section, and shall be 5’ wide by 7’ long |
| Status |
Permanent |
| Type of connection for access road |
Verify Existing Drive |
| Type of construction of property |
Mobile Home |
| If the type of construction is not listed, please describe below |
MOBILE HOME REPLACEMENT / SHARED DRIVEWAY |
| Normal vehicle usage: |
Automobiles |
| Side Drain required |
Yes |
| Side Drain Size |
18 |
| Study Required |
No |
| Estimated Number of Vehicle trips per day |
1 |
| Is the access for commercial or residential use? |
Residential |
| County Road Type |
Paved |
Review Notes
| 3/3/2026 |
Application submitted by applicant. |
| 3/3/2026 |
Pending Public Works Application Approval |
| 3/3/2026 |
Application Status Update Notification |
| 3/3/2026 |
Application Approved by Public Works |
| 3/6/2026 |
Pending initial driveway inspection |
| 3/11/2026 |
Permit Issued |
Contractors
| Name / Business |
License |
Title |
Role |
Inspections
| Inspection |
Notes |
Performed By |
Date |
| Passed: Engineering - Verify Easement Requirements |
|
Chad Williams |
3/3/2026 |
| Passed: Engineering - ROW Access/Driveway connects to county maintained road |
|
Chad Williams |
3/3/2026 |
| Failed: Engineering - Verify existing driveway |
Inspection Notes: This Driveway Needs A Pipe Extension From The Adjacent Parcel Any Further Questions Please Contact Chad Williams 386-623-2452. |
Smith, Blake |
3/5/2026 |
| Passed: Engineering - Initial Driveway |
Inspection Notes: The County Doesn’t Have A Detail For A Pipe Extension. But Can Connect To Adjacent Parcel By Cutting Off Miterd End And Placing 18 Inch Corrugated Metal Pipe With Band 24 Feet Minimum Length With The Standard Concrete Mitered End With 4 Inches Limerock Minimal For Cover |
Smith, Blake |
3/11/2026 |
| Passed: Engineering - Verify existing driveway |
|
Smith, Blake |
5/1/2026 |