Permit
19816 S US HIGHWAY 441HIGH SPRINGS, FL 32643
Quentin Steedley
Pinnacle Site Solutions
County License & State License & Liability Insurance & Workers Comp Expired.
Donald Davis
High Springs Electric Inc
Donald R Davis
Clayton T Davis
Davis Brothers Alachua Plumbing Llc
Lyndsay P Ayers
Ayers Construction & Roofing Co., Inc.
Passed: Fire - Plan Review
Inspected by Cpt. Shane Overstreet
Cancelled: Building - Monolithic Slab
Inspected by Callen
Passed: Engineering - Setbacks
Inspected by Christian Allen
Passed: Electrical - Footer Steel & Grounding
Footers For Piers Throughout Main Office
Passed: Plumbing/Gas - 1st Underground Rough–In
Inspected by Troy Crews
Passed: Electrical - 1st Underground Rough–In
Passed: Building - Monolithic Slab
Rescheduled 4/6/2026:Building - Framing
Inspected by Ewilliams
Passed: Building - Framing
Steel Framing Only Front Office Building Rear Building Not Complete At This Time
Main Iron Frame And Mezzanine Deck
Passed: Building - Spot Check
Spot Check On Framing And Bathrooms
Passed: Plumbing/Gas - 2nd Rough-In
Passed: Electrical - 2nd Rough-In
Passed: Mechanical - Rough In
Need To See Bath Fan Ducts On Open Ceiling Inspection
Passed: Building - Insulation
Roof Only Need To Do Wall Insulation Inspection Prior To Sheetrock
Passed: Electrical - Permanent Power
Need Septic Final And Final Release From Dot On Driveway For Power Release
Cancelled: Electrical - Temporary Power Service
Inspected by Tcrews
Cancelled: Electrical - 1st Underground Rough–In
Septic Release Inspection
Inspected by Health Dept
Open Ceiling To Set Tiles
Rescheduled 8/14/2026:Fire - Fire Final
Rescheduled 8/14/2026:Engineering - Zoning Final
Passed: Building - Final
Pictures Of Handicap Parking And Required Gfci Plugs--- Zoning & Fire Final Passed-- Dot Pending-- 9.14.26 Mg
Passed: Engineering - Zoning Final
Pictures Of Handicap Parking And Required Gfci Plugs (rec'd)--- Zoning & Fire Final Passed-- Dot Pending-- 9.14.26 Mg
Rescheduled 8/17/2026:Engineering - D.O.T Final Driveway
Rescheduled 8/17/2026:Engineering - Zoning Final
Rescheduled 8/17/2026:Fire - Fire Final
Passed: Fire - Fire Final
Passed
Inspected by S. Overstreet
Cancelled: Engineering - D.O.T Final Driveway
Inspected by Mgarber
Passed: Engineering - D.O.T Final Driveway
Inspected by Brad Long