Permit Details

Permit Search

Permit

New Residential Construction

1067 NW PARNELL AVE
LAKE CITY, FL 32055

Permit #
000054955
Application #
74545
Status Completed
  1. Submitted Jan 6, 2026
  2. Issued Feb 12, 2026
  3. Expires Feb 24, 2027
  4. Completed Aug 31, 2026

Property

Parcel #
01772-041
Owner
Jones Kathy Graham, Jones Julius
Acres
1.77
Subdivision
Pine Hills Addition
Zoning
A-3
Flood zone
X
District
1

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Engineers Elevation Letter
Finished floor requirement
12" above adjacent ground for entire perimeter
Requirement needed
Slab Inspection
Document needed is
Upload Photos
Document receieved
Yes
Fema map number
12023C0186D
This is the construction of a
Single Family Dwelling
Setbacks Front
30'
Setback Side 1
25'
Setback Side 2
25'
Setbacks Rear
25'
Stories
1
Heated Area (Sqft)
2456
Total Area (Sqft)
3607
Building Height
15
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
single family dwelling
Building Code Edition
2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Septic# (00-0000) or (X00-000)
25-0776
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition)
a minimum 4-inch wide strip of selfadhering polymer-modified bitumen complying with ASTM D1970 or a minimum 3 ¾ - inch wide strip of selfadhering flexible flashing tape complying with AAMA 711, applied over all joints in the roof decking. A felt underlayment complying with ASTM D226 Type II, ASTM D4869 Type Ill or IV, or ASTM D6757, or a synthetic underlayment meeting the performance requirements specified, is required to be applied over the strips/tape over the entire roof.
Service Amps
200

Status & Review History

  1. Application pending.
  2. Application Status Update Notification
  3. Submitted by building department on applicant's behalf
  4. Application submitted by applicant.
  5. Application Status Update Notification
  6. Application Status Update Notification
  7. Application Status Update Notification
  8. Application Status Update Notification
  9. Application Status Update Notification
  10. Application Status Update Notification
  11. Application Status Update Notification
  12. Application Status Update Notification
  13. Application Status Update Notification
  14. Application Status Update Notification
  15. Application Status Update Notification
  16. Permit Issued
  17. Permit Reissued

Contractors

  • Bryan Zecher

    Bryan Zecher Homes Inc

    License
    CBC1257343
    Title
    Building Contractor
    Role
    Contractor
  • Anthony R Franks

    Lane Heating & Air Llc

    License
    CAC1818631
    Title
    Cert. A/c Class “b”
    Role
    Subcontractor

    County License & State License Expired.

  • Cody Barrs

    Barrs Plumbing Inc

    License
    CFC1427145
    Title
    Plumbing Contractor
    Role
    Subcontractor
  • Donald Hollingsworth Ii

    Holly Electric Inc

    License
    EC13012104
    Title
    Cert. Electrical
    Role
    Subcontractor
  • Daniel Byrd

    Byrds Eye Roofing Inc

    License
    CCC1332899
    Title
    Cert. Roofing
    Role
    Subcontractor

Inspections

  1. Feb 10, 2026

    Passed: Building - Footer

    Inspected by Troy Crews

  2. Feb 10, 2026

    Passed: Electrical - Footer Steel & Grounding

    Inspected by Troy Crews

  3. Feb 10, 2026

    Passed: Engineering - Setbacks

    Inspected by Troy Crews

  4. Feb 24, 2026

    Passed: Plumbing/Gas - 1st Underground Rough–In

    Inspected by Troy Crews

  5. Feb 26, 2026

    Passed: Electrical - Temporary Power Service

    Temp Pole Only

    Inspected by Gary Pitzer

  6. Mar 2, 2026

    Release to power company

    Inspected by Mgarber

  7. Mar 3, 2026

    Passed: Building - Slab

    Inspected by Troy Crews

  8. Mar 3, 2026

    Cancelled: Building - Monolithic Slab

    Inspected by Tcrews

  9. Apr 1, 2026

    Passed: Building - Wall Sheathing

    Inspected by Troy Crews

  10. Apr 1, 2026

    Passed: Building - Roof Decking

    Inspected by Troy Crews

  11. Apr 16, 2026

    Cancelled: Building - Ext Strapping/Wall Sheathing

    Already Done

    Inspected by Tcrews

  12. Apr 16, 2026

    Passed: Building - Framing

    Inspected by Troy Crews

  13. Apr 24, 2026

    Passed: Electrical - 2nd Rough-In

    Inspected by Troy Crews

  14. Apr 24, 2026

    Passed: Mechanical - Rough In

    Inspected by Troy Crews

  15. Apr 24, 2026

    Passed: Plumbing/Gas - 2nd Rough-In

    Inspected by Troy Crews

  16. Apr 30, 2026

    Passed: Building - Insulation

    Inspected by Troy Crews

  17. Jun 26, 2026

    Passed: Electrical - Permanent Power

    Need Drive Final For Power Release

    Inspected by Troy Crews

  18. Jul 7, 2026

    Septic Release Inspection

    Inspected by Health Dept

  19. Jul 9, 2026

    Release to power company

    Inspected by Ewilliams

  20. Aug 28, 2026

    Passed: Building - Final

    All Final Pressure Tests And Gas Startup Should Be Done By Gas Provider

    Inspected by Troy Crews

Documents