Right-of-Way Access/Driveway
Permit
| Application #: | 74831 |
| Permit #: |
000054866 |
| Related Permit: |
New Residential Construction: 000054872 |
| Submitted: | Tuesday, January 20, 2026 |
| Issued: | Thursday, January 22, 2026 |
| Expires: | Thursday, August 13, 2026 |
| Completed: | Thursday, August 13, 2026 |
| Status: |
Completed |
| Septic Release? |
N/A |
Job Details
| Finished floor requirement |
|
| Fema map number |
12023C0292D |
| Standards |
Driveway construction shall conform to the approved plan |
| Requirements |
An 18” storm pipe of approved material is required with a minimum length of 32 feet. 4” Concrete Pads shall be located on each mitered end section, and shall be 5’ wide by 7’ long |
| Status |
Permanent |
| Type of connection for access road |
Curb & Gutter |
| Type of construction of property |
Site Built Home |
| Normal vehicle usage: |
Automobiles |
| Side Drain required |
Yes |
| Side Drain Size (diameter in inches) |
18 |
| Study Required |
No |
| Estimated Number of Vehicle trips per day |
2 |
| Is the access for commercial or residential use? |
Residential |
| County Road Type |
Paved |
Review Notes
| 1/20/2026 |
Pending applicant completion and submission. |
| 1/20/2026 |
Application submitted by applicant. |
| 1/20/2026 |
Pending Public Works Application Approval |
| 1/20/2026 |
Application submitted by applicant. |
| 1/20/2026 |
Pending Public Works Application Approval |
| 1/20/2026 |
Application submitted by applicant. |
| 1/20/2026 |
Pending Public Works Application Approval |
| 1/20/2026 |
Application submitted by applicant. |
| 1/20/2026 |
Pending Public Works Application Approval |
| 1/21/2026 |
Application Approved by Public Works |
| 1/21/2026 |
Pending initial driveway inspection |
| 1/22/2026 |
Permit Issued |
Contractors
| Name / Business |
License |
Title |
Role |
Mitchell T Brown The Solid Rock Builders Construction, Inc.
Liability Insurance & Workers Comp Expired. |
CRC1335118 |
Cert. Residential |
Contractor |
Inspections
| Inspection |
Notes |
Performed By |
Date |
| Passed: Engineering - ROW Access/Driveway connects to county maintained road |
|
Chad Williams |
1/21/2026 |
| Passed: Engineering - Initial Driveway |
|
Smith, Blake |
1/22/2026 |
| Failed: Engineering - Final Driveway |
inspection Notes: The Minimum Of 4” Inches Limerock Hasn’t Been Placed On Top Of Driveway |
Smith, Blake |
8/5/2026 |
| Passed: Engineering - Final Driveway |
|
Smith, Blake |
8/13/2026 |