Permit Details

Permit Search

Permit

New Residential Construction

2135 SW KOONVILLE AVE
LAKE CITY, FL 32024

Permit #
000054469
Application #
73637
Status Completed
  1. Submitted Oct 8, 2025
  2. Issued Nov 13, 2025
  3. Expires Nov 30, 2026
  4. Completed Jun 3, 2026

Property

Parcel #
00327-000
Owner
Mchugh Judy Elaine,
Acres
6.36
Subdivision
—
Zoning
A-3
Flood zone
X
District
2

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Engineers Elevation Letter
Finished floor requirement
12" above adjacent grade for the entire perimeter of the foundation
Requirement needed
By Final Inspection
Document needed is
Upload Photos
Document receieved
Yes
Fema map number
12023C0270C
This is the construction of a
Single Family Dwelling
Setbacks Front
30'
Setback Side 1
25'
Setback Side 2
25'
Setbacks Rear
25'
Stories
1
Heated Area (Sqft)
1772
Total Area (Sqft)
2448
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
single family dwelling
Building Code Edition
2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Septic# (00-0000) or (X00-000)
25-0590
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition)
a minimum 4-inch wide strip of selfadhering polymer-modified bitumen complying with ASTM D1970 or a minimum 3 ¾ - inch wide strip of selfadhering flexible flashing tape complying with AAMA 711, applied over all joints in the roof decking. A felt underlayment complying with ASTM D226 Type II, ASTM D4869 Type Ill or IV, or ASTM D6757, or a synthetic underlayment meeting the performance requirements specified, is required to be applied over the strips/tape over the entire roof.
Service Amps
200

Status & Review History

  1. Application pending.
  2. Point Review - On Hold-Incomplete
  3. Point Review - Processing
  4. Point Review - Processing
  5. Point Review - Reviewed
  6. Submitted by building department on applicant's behalf
  7. Zoning Review - Documents Required
  8. Plan Review - Reviewed
  9. Zoning Review - Documents Required
  10. Zoning Review - Documents Required
  11. Application submitted by applicant.
  12. Zoning Review - Documents Required
  13. Zoning Review - Reviewed
  14. Final Review - Reviewed
  15. Final Review - Payment Needed
  16. Permit Issued

Contractors

  • Bryan Zecher

    Bryan Zecher Homes Inc

    License
    CBC1257343
    Title
    Building Contractor
    Role
    Contractor
  • Cody Barrs

    Barrs Plumbing Inc

    License
    CFC1427145
    Title
    Plumbing Contractor
    Role
    Subcontractor
  • Daniel Byrd

    Byrds Eye Roofing Inc

    License
    CCC1332899
    Title
    Cert. Roofing
    Role
    Subcontractor
  • Donald Hollingsworth Ii

    Holly Electric Inc

    License
    EC13012104
    Title
    Cert. Electrical
    Role
    Subcontractor
  • Anthony R Franks

    Lane Heating & Air Llc

    License
    CAC1818631
    Title
    Cert. A/c Class “b”
    Role
    Subcontractor

    County License & State License Expired.

  • Bryan Zecher

    Bryan Zecher Homes Inc

    License
    CBC1257343
    Title
    Building Contractor
    Role
    Subcontractor

Inspections

  1. Nov 18, 2025

    Passed: Building - Footer

    Inspected by Matt Forsyth

  2. Nov 18, 2025

    Passed: Engineering - Setbacks

    Inspected by Matt Forsyth

  3. Nov 20, 2025

    Passed: Electrical - Temporary Power Service

    Inspected by Matt Forsyth

  4. Dec 12, 2025

    Release to power company

    Ok To Release Temp Power-- 12.12.25 Mg

    Inspected by Mforsyth

  5. Dec 12, 2025

    Submitted Power Release through FPL Portal

    Inspected by Garber, Melissa

  6. Dec 23, 2025

    Passed: Plumbing/Gas - 1st Underground Rough–In

    Waste Pipe And Hvac Chase

    Inspected by Matt Forsyth

  7. Jan 6, 2026

    Passed: Building - Slab

    Inspected by Matt Forsyth

  8. Jan 28, 2026

    Passed: Building - Wall Sheathing

    Inspected by Matt Forsyth

  9. Jan 28, 2026

    Passed: Building - Roof Decking

    Inspected by Matt Forsyth

  10. Feb 17, 2026

    Passed: Building - Ext Strapping/Wall Sheathing

    Inspected by Matt Forsyth

  11. Feb 17, 2026

    Passed: Building - Framing

    Inspected by Matt Forsyth

  12. Feb 17, 2026

    Passed: Electrical - 2nd Rough-In

    Inspected by Matt Forsyth

  13. Feb 17, 2026

    Passed: Plumbing/Gas - 2nd Rough-In

    Inspected by Matt Forsyth

  14. Feb 17, 2026

    Passed: Mechanical - Rough In

    Inspected by Matt Forsyth

  15. Feb 20, 2026

    Passed: Building - Insulation

    Inspected by Matt Forsyth

  16. Apr 6, 2026

    Passed: Electrical - Permanent Power

    Need Septic Release

    Inspected by Matt Forsyth

  17. Apr 21, 2026

    Release to power company

    Inspected by Ewilliams

  18. Apr 21, 2026

    Septic Release Inspection

    Inspected by Health Dept

  19. Apr 22, 2026

    Submitted Power Release through FPL Portal

    Inspected by Ward, Emaleigh C.

  20. Jun 3, 2026

    Passed: Building - Final

    *all Requirements Met To Release Co-- 6.3.26 Mg

    Inspected by Matt Forsyth

Documents