Right-of-Way Access/Driveway
Permit
| Address |
4112 SW ICHETUCKNEE AVE |
| Parcel #: |
00479-203 |
| Acres: | |
| Owner: | Parnell Ana I, Parnell Anthony Glenn Jr |
| Subdivision: | Darwin L Perry |
| Zoning: | |
| Flood Zone: | |
| District: | |
| Application #: | 74110 |
| Permit #: |
000054467 |
| Related Permit: |
|
| Submitted: | Friday, October 31, 2025 |
| Issued: | Thursday, November 13, 2025 |
| Expires: | Sunday, November 12, 2028 |
| Completed: | |
| Status: |
Permit Issued |
| Septic Release? |
N/A |
Job Details
| Finished floor requirement |
|
| Standards |
Driveway construction shall conform to the approved plan |
| Requirements |
An 18” storm pipe of approved material is required with a minimum length of 32 feet. 4” Concrete Pads shall be located on each mitered end section, and shall be 5’ wide by 7’ long |
| Status |
Permanent |
| Type of connection for access road |
Rural Driveway |
| Type of construction of property |
Mobile Home |
| Normal vehicle usage: |
Automobiles |
| Side Drain required |
Yes |
| Side Drain Size (diameter in inches) |
18 |
| Study Required |
No |
| Estimated Number of Vehicle trips per day |
2 |
| Is the access for commercial or residential use? |
Residential |
| County Road Type |
Paved |
Review Notes
| 10/31/2025 |
Application submitted by applicant. |
| 10/31/2025 |
Pending Public Works Application Approval |
| 11/3/2025 |
Application Approved by Public Works |
| 11/10/2025 |
Pending initial driveway inspection |
| 11/13/2025 |
Permit Issued |
Contractors
| Name / Business |
License |
Title |
Role |
Inspections
| Inspection |
Notes |
Performed By |
Date |
| Passed: Engineering - ROW Access/Driveway connects to county maintained road |
|
Chad Williams |
11/3/2025 |
| Passed: Engineering - Initial Driveway |
|
Smith, Blake |
11/13/2025 |