Permit Details

Permit Search

Permit

Roof Replacement or Repair

234 SW LANCELOT GLN
LAKE CITY, FL 32024

Permit #
000054376
Application #
74089
Status Completed
  1. Submitted Oct 30, 2025
  2. Issued Oct 30, 2025
  3. Expires May 18, 2026
  4. Completed Nov 19, 2025

Property

Parcel #
03099-220
Owner
Cray Elmira Cassandra,
Acres
0.51
Subdivision
Stonehenge Phase 2
Zoning
RSF-2
Flood zone
X
District
3

Permit

Status
Completed
Septic release
N/A
Related permit
—

Job Details

Finished floor requirement
Fema map number
12023C0293D
Type Roofing Job
Overlay with Metal
Further Job Details (Explain if decking is being replaced and or Repairs are being done.)
metal over shingle
Type of structure
House
Commercial or Residential
Residential
Roof Area (for this job) Sq Ft
2979
No. of Stories
1
Is the existing roof being removed?
No
Explain if not removing the existing roofing material?
metal over shingles
Type of New Roofing Product
Metal
Florida Product Approval Number
FL46679.01
Product Manufacturer
mission Metal
Product Description
metal
Building Code Edition
2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Sealed roof decking options: (Must select an option.)
two layers of felt underlayment comply ASTM 0226 Type II or ASTM D4869 Type Ill or IV, or two layers of a synthetic underlayment meeting the performance requirements specified, lapped and fastened as specified.
Ventilation:
Off-ridge Vent
Flashing:
Replace All
Drip Edge:
Replace All
Valley Treatment:
New Metal
Any cable and/or race-way wiring located on or within the roof assembly?
No

Status & Review History

  1. Application pending.
  2. Application submitted by applicant.
  3. City of Lake City Utilities Notified.
  4. Final Review - Payment Needed
  5. Permit Issued
  6. Application submitted by applicant.
  7. Final Review - Complete

Contractors

  • Harry D Anderson Jr

    Southeastern Coatings & Waterproofing, Inc.

    License
    CCC1326114
    Title
    Roofing Contractor
    Role
    Contractor

Inspections

  1. Oct 31, 2025

    Passed: Re-Roof - In Progress

    Inspected by Gary Pitzer

  2. Nov 14, 2025

    Passed: Re-Roof - Roof Affidavit Review

    Inspected by Gary Pitzer

  3. Nov 14, 2025

    Passed: Re-Roof - Roof Pictures Review

    Inspected by Gary Pitzer

  4. Nov 19, 2025

    Passed: Re-Roof - Final

    Inspected by Matt Forsyth