Permit

Roof Replacement or Repair

9229 SW STATE ROAD 47
LAKE CITY, FL 32024

Permit #
000053921
Application #
72904
Status Completed
  1. Submitted Aug 26, 2025
  2. Issued Aug 26, 2025
  3. Expires Mar 30, 2026
  4. Completed Oct 1, 2025

Property

Parcel #
03622-057
Owner
Winsberg Julia
Acres
1.00
Subdivision
Timberlane
Zoning
ESA-2
Flood zone
X
District
5

Permit

Status
Completed
Septic release
N/A
Related permit
—

Job Details

Finished floor requirement
Fema map number
12023C0390C
Type Roofing Job
Overlay with Metal
Further Job Details (Explain if decking is being replaced and or Repairs are being done.)
metal over shingles
Type of structure
House
Commercial or Residential
Residential
Roof Area (for this job) Sq Ft
1430
No. of Stories
1
Roof Pitch
4:12 or Greater
Is the existing roof being removed?
No
Explain if not removing the existing roofing material?
Placing metal over Shingles
Type of New Roofing Product
Metal
Florida Product Approval Number
FL46670.01
Product Manufacturer
Mission Metals
Product Description
metal
Building Code Edition
2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Sealed roof decking options: (Must select an option.)
a self-adhering polymer-modified bitumen underlayment complying with ASTM D1970 applied over the entire roof.;two layers of felt underlayment comply ASTM 0226 Type II or ASTM D4869 Type Ill or IV, or two layers of a synthetic underlayment meeting the performance requirements specified, lapped and fastened as specified.
Ventilation:
Off-ridge Vent
Flashing:
Replace All
Drip Edge:
Replace All
Valley Treatment:
New Metal
Any cable and/or race-way wiring located on or within the roof assembly?
No

Status & Review History

  1. Application pending.
  2. Application submitted by applicant.
  3. Final Review - Payment Needed
  4. Permit Issued
  5. Final Review - Complete

Contractors

  • Harry D Anderson Jr

    Southeastern Coatings & Waterproofing, Inc.

    License
    CCC1326114
    Title
    Roofing Contractor
    Role
    Contractor

Inspections

  1. Sep 9, 2025

    Passed: Re-Roof - In Progress

    Inspected by Matt Forsyth

  2. Sep 19, 2025

    Passed: Re-Roof - Roof Affidavit Review

    Inspected by Matt Forsyth

  3. Sep 19, 2025

    Passed: Re-Roof - Roof Pictures Review

    Inspected by Matt Forsyth

  4. Oct 1, 2025

    Passed: Re-Roof - Final

    Galvalume' Metal Roof

    Inspected by Matt Forsyth