Permit Details

Permit Search

Permit

New Commercial Construction

149 SW WOOLSEY GLN
LAKE CITY, FL 32024

Permit #
000053769
Application #
72048
Status Completed
  1. Submitted Jul 14, 2025
  2. Issued Aug 4, 2025
  3. Expires Apr 8, 2026
  4. Completed Oct 10, 2025

Property

Parcel #
02719-000
Owner
Woods Project Llc,
Acres
0.00
Subdivision
—
Zoning
CI
Flood zone
X
District
3

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Accessory Use
Finished floor requirement
Fema map number
12023C0291D
This is the construction of a:
Pole Barn for Toilet Facilities
Driveway access to property:
Existing Drive
Is there a Fire Sprinkler System?
No
Setbacks Front
20'
Setback Side 1
0'
Setback Side 2
0'
Setback Rear
15'
Describe commercial use:
toilet facilities
Stories
1
Heated Area (Sqft)
0
Total Area (Sqft)
1440
Building Height
12
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Assembly
Occupancy Use Title
restrooms
Building Code Edition
2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Septic# (00-0000) or (X00-000)
24-0827
Sealed roof decking options. (Must select one.)
Other (explain)
Sealed roof decking explanation for other option.
METAL BUILDING
Service Amps
400

Status & Review History

  1. Application pending.
  2. City of Lake City Utilities Notified.
  3. Point Review - Processing
  4. Zoning Review - Reviewed
  5. Plan Review - Plumbing Approved
  6. Plan Review - Electrical Approved
  7. Plan Review - Building Approved
  8. Plan Review - Reviewed
  9. Final Review - Processing
  10. Final Review - Reviewed
  11. Final Review - Payment Needed
  12. Final Review - Complete
  13. Permit Issued

Contractors

  • Josh Sparks

    Sparks Construction

    License
    CBC1252260
    Title
    Building Contractor
    Role
    Contractor
  • Benjamin L Sparks

    Line Electric Company Llc

    License
    EC13009101
    Title
    Cert. Electrical
    Role
    Subcontractor

    County License & State License Expired.

  • Cody Barrs

    Barrs Plumbing Inc

    License
    CFC1427145
    Title
    Plumbing Contractor
    Role
    Subcontractor

Inspections

  1. Aug 15, 2025

    Failed: Building - Footer

    Washed In Need To Dry Out And Clean Out

    Inspected by Troy Crews

  2. Aug 15, 2025

    Passed: Engineering - Setbacks

    Inspected by Troy Crews

  3. Aug 18, 2025

    Passed: Building - Footer

    Inspected by Troy Crews

  4. Aug 18, 2025

    Passed: Engineering - Setbacks

    Inspected by Troy Crews

  5. Aug 22, 2025

    Passed: Building - Lintel/Tie Beam

    Block Walls In Bathroom Shelter

    Inspected by Troy Crews

  6. Sep 23, 2025

    Rescheduled 9/25/2025:Fire - Fire Final

    Inspected by Tcrews

  7. Sep 23, 2025

    Rescheduled 9/25/2025:Building - Final

    Inspected by Tcrews

  8. Sep 25, 2025

    Failed: Fire - Fire Final

    Needs An Exit Light Above Doorway In The Bar And Exit Light On Door Behind The Bar

    Inspected by Sahne Overstreet

  9. Sep 25, 2025

    Failed: Building - Final

    Need To Complete Power Connections To Pre-fab Bathrooms, Complete Overhead Lighting Over Sink Areas. Complete Gravel At Sidewalk Area Between Building To Prevent Trip Hazard. Fire Dept Needs Exit Light At North Door Of Bar Area

    Inspected by Troy Crews

  10. Sep 29, 2025

    Rescheduled 9/30/2025:Building - Final

    Inspected by Aaslan

  11. Sep 30, 2025

    Failed: Building - Final

    Need To Complete Steps To Stage, If Top Riser Not Level With Stage Will Need Handrail For Four Or More Risers., S.e.buillding Not Built Out Will Require Review And Permitting At Later Date.

    Inspected by Troy Crews

  12. Oct 10, 2025

    Release to power company

    Rec'd Septic And Pics For Steps

    Inspected by Ewilliams

  13. Oct 10, 2025

    Passed: Certificate-Release Certificate

    Rec'd Septic/pics Of Stage Steps

    Inspected by Crews, Malcolm T.

  14. Oct 10, 2025

    Septic Release Inspection

    Inspected by Health Dept

  15. Oct 10, 2025

    Passed: Building - Final

    Handrails Installed

    Inspected by Troy Crews

  16. Oct 10, 2025

    Passed: Electrical - Permanent Power

    Inspected by Troy Crews

  17. Oct 10, 2025

    Release to power company

    Inspected by Troy Crews

  18. Requested

    Engineering - D.O.T Final Driveway

    Awaiting inspection

  19. Requested

    Building - Final

    Awaiting inspection

Documents