Permit Details

Permit Search

Permit

Roof Replacement or Repair

170 SW WOOD DUCK CT
LAKE CITY, FL 32024

Permit #
000053497
Application #
71846
Status Completed
  1. Submitted Jul 1, 2025
  2. Issued Jul 1, 2025
  3. Expires Jan 10, 2026
  4. Completed Jul 14, 2025

Property

Parcel #
02434-015
Owner
Cadet Jean Felert, Cadet Marie C
Acres
2.23
Subdivision
Cypress Lake
Zoning
RSF-2
Flood zone
A
District
3

Permit

Status
Completed
Septic release
N/A
Related permit
—

Job Details

Finished floor requirement
Fema map number
12023C0290D
Type Roofing Job
Replacement - Tear off Existing and Replace
Type of structure
House
Commercial or Residential
Residential
Roof Area (for this job) Sq Ft
60
No. of Stories
1
Roof Pitch
4:12 or Greater
Is the existing roof being removed?
Yes
Type of New Roofing Product
Asphalt Shingles
Florida Product Approval Number
35321
Product Manufacturer
tamko
Product Description
shingles
Building Code Edition
2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Sealed roof decking options: (Must select an option.)
a minimum 4-inch wide strip of selfadhering polymer-modified bitumen complying with ASTM D1970 or a minimum 3 ¾ - inch wide strip of selfadhering flexible flashing tape complying with AAMA 711, applied over all joints in the roof decking. A felt underlayment complying with ASTM D226 Type II, ASTM D4869 Type Ill or IV, or ASTM D6757, or a synthetic underlayment meeting the performance requirements specified, is required to be applied over the strips/tape over the entire roof.
Ventilation:
Ridge Vent
Flashing:
Use Existing
Drip Edge:
Replace All
Valley Treatment:
New Metal
Any cable and/or race-way wiring located on or within the roof assembly?
No

Status & Review History

  1. City of Lake City Utilities Notified.
  2. Permit Issued

Contractors

  • Tyler M Turner

    Tmt Roofing Llc

    License
    CCC1330410
    Title
    Cert Roofing
    Role
    Contractor

Inspections

  1. Jul 8, 2025

    Passed: Re-Roof - In Progress

    Tear-off Completed, Nailed And Underlayment Completed, Shingles Started

    Inspected by Gary Pitzer

  2. Jul 14, 2025

    Passed: Re-Roof - Final

    Inspected by Matt Forsyth