Permit Details

Permit Search

Permit

Right-of-Way Access/Driveway

,

Permit #
000053470
Application #
71339
Status Completed
  1. Submitted Jun 26, 2025
  2. Issued Jun 26, 2025
  3. Expires Mar 3, 2029
  4. Completed Mar 4, 2026

Property

Parcel #
04667-001
Owner
4 Guys Investments Llc,
Acres
4.38
Subdivision
—
Zoning
A-3
Flood zone
A
District
1

Permit

Status
Completed
Septic release
N/A
Related permit
Site Use Approval: SITE-USE2025-096

Job Details

Finished floor requirement
Fema map number
12023C0205D
Building Permit #
SITE-USE2025-096
Standards
Culvert installation shall conform to the approved site plan standards
Requirements
An 18” storm pipe of approved material is required with a minimum length of 32 feet. 4” Concrete Pads shall be located on each mitered end section, and shall be 5’ wide by 7’ long
Status
Permanent
Side Drain required
Yes
Side Drain Size (diameter in inches)
18
Study Required
No
County Road Type
Paved
Type of connection for access road
Rural Driveway
Type of construction of property
Mobile Home
Normal vehicle usage:
Automobiles
Estimated Number of Vehicle trips per day
4
Is the access for commercial or residential use?
Residential

Status & Review History

  1. Pending applicant completion and submission.
  2. Final Review - Corrections Needed
  3. Final Review - Corrections Needed
  4. Final Review - Corrections Needed
  5. Email confirmation reminder sent.
  6. Final Review - Corrections Needed
  7. Final Review - Corrections Needed
  8. Final Review - Corrections Needed
  9. Final Review - Corrections Needed
  10. Final Review - Corrections Needed
  11. Final Review - Corrections Needed
  12. Email confirmation reminder sent.
  13. Final Review - Corrections Needed
  14. Final Review - Corrections Needed
  15. Application submitted by applicant.
  16. Pending Public Works Application Approval
  17. Application Approved by Public Works
  18. Pending initial driveway inspection
  19. Permit Issued

Contractors

No contractors are listed on this permit.

Inspections

  1. Jun 26, 2025

    Passed: Engineering - Initial Driveway

    Inspected by Smith, Blake

  2. Jun 26, 2025

    Passed: Engineering - ROW Access/Driveway connects to county maintained road

    Road Is County Maintained-- You May Proceed -- Per Blake

    Inspected by Melissa Garber

  3. Mar 4, 2026

    Passed: Engineering - Final Driveway

    Inspected by Smith, Blake